The purpose of this Subpart is to implement the PBR program provided for in Section 39.12 of the Act for classes of emission units described in this and following Subparts that address specific types of units covered by the PBR program. By fulfilling all the applicable requirements of this Subpart and the applicable Subpart for the specific type of emission unit, an owner or operator of a source seeking a PBR for an emission unit is considered to have met the requirement to submit an application for a construction permit and obtain such a construction permit pursuant to Section 9(b) of the Act and 35 Ill. Adm. Code 201.142, 201.152, and 201.160(a).
Ill. Admin. Code tit. 35, § 201.500