At the end of the postclosure maintenance period, the owner or operator must submit a certification by a PE or PG and an affidavit by the owner or operator demonstrating that, due to compliance with the postclosure maintenance plan and the postclosure maintenance requirements of this Part, postclosure maintenance is no longer necessary because:
Ill. Admin. Code tit. 35, § 1100.530
Added at 36 Ill. Reg. 13892, effective August 27, 2012