The public library shall have a period of 90 days from the time the State Librarian determines eligibility, as stipulated in Section 3035.520(c) and (d), to acquire title to the site, or rights of use and exclusion sufficient to carry out the purposes and programs of the public library. Extensions will be granted in those cases in which there is a reasonable expectation that the public library will be able to acquire the site within the period of the extension and the delay has been occasioned by a condition beyond the control of the public library, such as a delay in acquiring a title commitment.
The proposed site shall be in concurrence with the public library facility plan, as stipulated in Section 3035.520(b)(2)(A), (B) and (C), and contain usable space sufficient in size and of regular configuration so as to accommodate the library's on-site program, as well as to accommodate ancillary functions that are better served on-site than off-site, and pedestrian movement among different points on the site.
Water must be made available at the site in sufficient volume and delivery rates and of appropriate quality to serve the firefighting needs of the proposed public library, as well as to accommodate other forms of water consumption.
The location or character of the site must not prevent the disposal of sanitary sewage from the public library.
The location or character of the site must not prevent the disposal of storm water from the public library site.
The site must present no obstacles to the provision of electric power, telephone services, and whatever gas service the public library may require at the point in the construction process when utility hook-ups are made.
Solid waste management services must be available to the site.
Ill. Admin. Code tit. 23, § 3035.565