Ill. Admin. Code tit. 2, pt. 3100, app B, ILLUSTRATION D

Current through Register Vol. 49, No. 2, January 10, 2025
Extension of Time for Disclosure (Repealed)

Ill. Admin. Code tit. 2, pt. 3100, app B, ILLUSTRATION D

Amended at 30 Ill. Reg. 19615, effective December 12, 2006
Repealed at 47 Ill. Reg. 1334, effective 1/17/2023