Idaho Admin. Code r. 58.01.13.500

Current through September 2, 2024
Section 58.01.13.500 - PERMIT CONDITIONS

The following conditions apply to and must be specified in all permits:

01.Compliance Required. The applicant or permittee must comply with all conditions of the permit. Issuance or possession of a permit issued according to these rules does not relieve the applicant or permittee of the responsibility to comply with all other applicable local, state, and federal laws.
02.Construction. Construction of individual components of a cyanidation facility may commence upon approval by the Department of the final plans and specifications for that component.
03.Record Plans and Specifications. An Idaho licensed professional engineer must confirm in writing that all record drawings and specifications are complete and accurate. These record plans and specifications must be submitted by the permittee to the Director within thirty (30) days after the completion of the construction of each critical phase of facility development as approved by the Department. The record plans and specifications must be accompanied by a final construction report. If the construction does not deviate from the approved plans and specifications, a statement to the effect must be submitted by the engineer. The Department will review the final construction report, including record plans and specifications and results of quality control and quality assurance testing, to verify that the facility was constructed in compliance with and does not deviate from the approved plans and specifications. If the Department determines that the facility was not constructed in compliance with or deviates from the approved plans and specifications, the Department will provide the permittee written notice of necessary corrective actions within thirty (30) days of receipt of all submittals required by this subsection. In the event the Department provides such written notice, operation of the facility may not begin until the Department inspects and provides written approval of the corrective actions. Operation of the facility may begin if the Department does not deliver to the permittee such written notice within thirty (30) days of receipt of all submittals required by this subsection.
04.Duty to Provide Information. The permittee must furnish to the Director, within a reasonable or specified time, any information, including copies of records required by the permit or other applicable rules, that the Director may request to determine whether cause exists for modifying or revoking the permit or to determine compliance with the permit or other applicable rules.
05.Notifications. After initial construction and seasonal and/or temporary closure, the permittee must, within thirty (30) days, provide written notice to the Director of the permittee's intentions to commence or restart operations. At least thirty (30) days prior to completion of operations, and/or temporary or seasonal operations, the permittee must notify the Director of the permittee's intentions to temporarily, seasonally or permanently close operations. Notification must provide sufficient time for the Director to provide pre-operational or post-operational inspections, as necessary.
06.Entry and Access. The permittee must allow the Director, or a designee obligated by agreement with the Director to comply with the confidentiality provisions of Section 39-111, Idaho Code, to:
a. Enter at reasonable times upon the premises of a permitted cyanidation facility or where records required by a permit are kept;
b. Have access to and copy at reasonable times any records that must be kept under the conditions of the permit;
c. Inspect at reasonable times any cyanidation facility, equipment, practice, or operation permitted or required by the permit; and
d. Sample or monitor at reasonable times, substance(s) or parameter(s) directly related to permit or regulation compliance.
07.Reporting. It is the permittee's responsibility to report to the Director:
a. Orally, as soon as possible but no later than twenty-four (24) hours from the time the permittee knows or should reasonably know of any noncompliance that may endanger the public health or the environment.
b. In writing, within five (5) working days from the time a permittee knows or should reasonably know of any event that may be or that may result in a violation of these rules, or IDAPA 58.01.02, "Water Quality Standards," or IDAPA 58.01.11, "Ground Water Quality Rule." This report must contain:
i. A description of the event and its cause; if the cause is not known, steps taken to investigate and determine the cause;
ii. The period of the event including, to the extent possible, the individual(s) involved in the incident(s) and the time(s) and date(s) of the incidents;
iii. Measures taken to mitigate or eliminate the event and protect the public health; and
iv. Steps taken to prevent recurrence of the event;
c. In writing, confirmation of any conditions that may result in violation of any permit condition; and
d. In writing, when the permittee knows or should reasonably know of relevant facts not submitted or incorrect information submitted in a permit application or any report or notice to the Director or the Department. Those facts or the correct information must be included as a part of this report.
08.Discharge Response. If an unauthorized discharge occurs the permittee must implement the Department approved emergency and spill response plan.
09.Temporary or Seasonal Closure Plans. Prior to temporary or seasonal closure, the permittee must submit a temporary or seasonal closure plan to the Director for approval. The plan must describe the procedures, methods, and schedule to be implemented for the treatment and disposal of process water and pollutants, the control of drainage from the cyanidation facility, the control of drainage from the surrounding area, and the secure storage of chemicals during the period of closure. Within thirty (30) days of receiving the plan, the Director will approve and/or suggest modifications necessary to protect waters. The permittee must ensure that closure complies with an approved plan. The approved plan must be implemented before the permittee completes temporary or seasonal closure. Facilities may not be temporarily or seasonally closed for a period longer than two (2) years unless approved by the Director.
10.Begin Construction. If the permittee fails to begin construction of a cyanidation facility within one (1) year of the effective date of the permit, the permit will be deemed void.
11.Permanent Closure. The permanent closure plan, as approved by the Idaho Department of Lands, will be incorporated by reference into the Department-issued permit as a permit condition and will be enforceable as such.

Idaho Admin. Code r. 58.01.13.500

Effective March 24, 2022