Current through September 2, 2024
Section 58.01.01.402 - APPLICATION PROCEDURESApplication for a Tier II operating permit must be made using forms furnished by the Department, or by other means approved by the Department. The application must be certified by the responsible official and be accompanied by all information necessary to perform any analysis or make any determination required under Sections 400 through 410.
01.Required Information. Site information, plans, description, specifications, and drawings showing the design of the stationary source, facility, or modification, the nature and amount of emissions (including secondary emissions), and the manner in which it will be operated and controlled.02.Additional Specific Information.a. For emission reduction credits, a description of the emission reduction credits proposed for use, including descriptions of the stationary sources or facilities providing the reductions, a description of the system of continuous emission control that provides the emission reduction credits, emission estimates, and other information necessary to determine that the emission reductions satisfy the requirements for emission reduction credits (Section 460).b. For emission offsets, information on the air quality impacts of the traded emissions as necessary to determine the change in ambient air quality that would occur.c. For restrictions on potential to emit, a description of the proposed potential to emit limitations including the proposed monitoring and recordkeeping requirements that will be used to verify compliance with the limitations.03.Estimates of Ambient Concentrations. All estimates of ambient concentrations must be based on the applicable air quality models, data bases, and other requirements specified in 40 CFR Part 51 Appendix W (Guideline on Air Quality Models). Where an air quality model specified in the "Guideline on Air Quality Models" is inappropriate, the model may be modified or another model substituted, subject to written approval of the EPA Administrator and public comment pursuant to Subsection 404.01.c.04.Additional Information. Any additional information, plans, specifications, evidence or documents that the Department may require to make the determinations required under Sections 400 through 409 shall be furnished upon request.Idaho Admin. Code r. 58.01.01.402