Current through September 2, 2024
Section 58.01.01.336 - TIER I OPERATING PERMITS FOR TIER I PORTABLE SOURCES01.Portable Tier I Source Permit Issuance.a. The Department may issue a single Tier I operating permit authorizing emissions from similar operations of a portable Tier I source by the owner or operator at multiple temporary locations.b. The operation must be temporary and involve at least one (1) change of location for the portable Tier I source during the term of the Tier I operating permit.02.Phase II Sources. No Phase II source may be permitted as a portable Tier I source.03.Portable Tier I Source Permit Content. Tier I operating permits for portable Tier I sources will include the following:a. Terms and conditions that will ensure compliance with all applicable requirements at all authorized locations;b. Requirements that the owner or operator notify the Department at least ten (10) days in advance of each change in location in accordance with Section 500; andc. All terms and conditions identified in Sections 322, 325, and 332.Idaho Admin. Code r. 58.01.01.336