Current through September 2, 2024
Section 58.01.01.180 - REVISIONS TO PERMITS ESTABLISHING A FACILITY EMISSIONS CAPSection 180 requires revisions to terms and conditions establishing a FEC. The permittee is exempt from Sections 200 through 227 unless the permittee chooses to use those rules to process any change to the permit, except as provided in Subsection 180.02.
01.Criteria. A permit revision is required for the following: a. A change to existing monitoring, reporting or recordkeeping requirements in the permit establishing the FEC;b. A change to the FEC; orc. A change to the facility that would impose new requirements not included in the permit establishing the FEC.02.Permit Revision Application Procedures. A permittee may initiate a permit revision by submitting a permit revision application to the Department or by complying with other applicable sections (Sections 200 or 400). For revision of terms and conditions establishing the FEC, it is presumed that the previous permitting analysis is satisfactory unless the Department determines otherwise. A permit revision application must: a. Meet the standard application requirements of Section 177; b. Describe the proposed permit revision;c. Describe and quantify the change in emissions above the FEC permit limit; andd. Identify new requirements resulting from the change.03.Permit Revisions. The Department will process permit revisions pursuant to Section 209 or Section 404.Idaho Admin. Code r. 58.01.01.180