Idaho Admin. Code r. 58.01.01.178

Current through September 2, 2024
Section 58.01.01.178 - STANDARD CONTENTS OF PERMITS ESTABLISHING A FACILITY EMISSIONS CAP

In addition to the elements required by Sections 203 and 211 or Sections 403 and 405, whichever is applicable, the Department has the authority to impose, implement and enforce the terms in Subsections 178.01 through 178.05 and conditions establishing a FEC.

01.Emission Limitations and Standards. All permits establishing use of a FEC will contain annual facility wide emissions limitations for each FEC pollutant.
02.Monitoring. All permits establishing a FEC will contain sufficient monitoring to ensure compliance with the FEC on a rolling twelve (12) month consecutive basis.
03.Recordkeeping. All permits establishing a FEC will include the following:
a. Sufficient recordkeeping to assure compliance with the FEC.
b. Retention of required monitoring records and support information for a period of at least five (5) years from the date of the monitoring sample, measurement, report or application. Supporting information includes, but is not limited to, calibration and maintenance records and original strip-chart recordings for continuous monitoring instrumentation and copies of all reports required by the permit.
04.Reporting. All permits establishing a FEC will include the following:
a. Sufficient reporting to assure compliance with the permit establishing the FEC.
b. Submittal of an annual report each year on or before the anniversary date of permit issuance. All required reports must be certified in accordance with Section 123.
05.Duration. Each permit establishing a FEC will state that the terms and conditions establishing the FEC are effective for a fixed term of five (5) years.

Idaho Admin. Code r. 58.01.01.178

Effective March 28, 2023