Idaho Admin. Code r. 20.03.15.055

Current through September 2, 2024
Section 20.03.15.055 - DEVELOPMENT AND PRODUCTION UNDER THE LEASE
01.Diligent Development of Lease and Production. Lessee must develop the geothermal resources on their lease area and start production within the first ten (10) years of the initial lease term or as otherwise extended by lease provision. Development of the lease area requires wells to be drilled and other necessary infrastructure to be built. Production on the lease area means that geothermal fluids are being used and royalties are being paid to the state. Failure to develop the lease and start production as described may result in lease cancellation unless the Lessee applies to the Department for an extension and the extension is granted.
02.Best Practices. All operations will conform to the best practice and engineering principles in use in the industry. Operations must be conducted in such a manner as to protect the natural resources on the leased lands, including without limitation geothermal resources, and to result in the maximum ultimate recovery of geothermal resources with a minimum of waste, and be consistent with the principles of the use of the land for other purposes and of the protection of the environment. Lessee must promptly remove from the leased lands or store, in an orderly manner, all scraps or other materials not in use and not reasonably incident to the operation.
03.Plans Required. Prior to development, Lessee must submit a Development Plan, Operating Plan, and Decommissioning and Reclamation Plan for the leased lands. All plans must be approved by the Department, in writing, prior to Lessee beginning a phase of the lease in which those plans are performed or as otherwise required by the lease. All required plans must include all items that the Department deems necessary or useful in managing the geothermal resources, including, but not limited to, those items referred to in Paragraphs 054.03.a. and 054.03.b. of these rules.
04.Waste and Damage.
a. Lessee must take all reasonable precautions to prevent the following:
i. Waste;
ii. Damage to other natural resources;
iii. Injury or damage to persons, real or personal property; and
iv. Any environmental pollution or damages that may constitute a violation of state or federal laws.
b. The Department may inspect Lessee's operations and issue such orders as are necessary to accomplish the purposes in Paragraph 055.04.a. Any significant effect on the environment created by the Lessee's operations or failure to comply with environmental standards must be reported to the Department by Lessee within twenty-four (24) hours and confirmed in writing within thirty (30) days.
05.Notice of Production. Lessee must notify the department within sixty (60) days before any geothermal resources are used or removed for commercial purposes.
06.Amendments. The plan of operations must be amended by the Lessee for the Department's approval to reflect changes in operations on the leased lands, including the installation of works, buildings, plants or structures for the production, marketing or utilization of geothermal resources.

Idaho Admin. Code r. 20.03.15.055

Effective March 18, 2022