Idaho Admin. Code r. 20.03.03.018

Current through September 2, 2024
Section 20.03.03.018 - ACREAGE AND RECLAMATION COST LIMITATIONS
01.Actual Allowable Participation. The Board will establish by policy the actual allowable disturbance, actual allowable reclamation cost, and the minimum dollar per acre of disturbance in order to provide financial assurance to opt out of participation in the Reclamation Fund.
02.Maximum Disturbance and Reclamation Cost. The maximum allowable disturbance is eighty (80) acres; the maximum allowable reclamation cost is four hundred forty thousand dollars ($440,000).
03.Multiple Plans or Permits. An operator who has multiple mining reclamation plans or permits that have a total disturbance in excess of the actual allowable disturbance, or with total reclamation costs in excess of the actual allowable reclamation cost, may participate in the Reclamation Fund with one (1) or more sites that together contain less than both of the Board-established actual allowable limits.

Idaho Admin. Code r. 20.03.03.018

Effective July 1, 2024