Current through November, 2024
Section 6-80-80 - Attachment modification(a) Whenever the owner of a pole, duct, conduit, or right-of-way intends to modify or alter the pole, duct, conduit, or right-of-way, the owner shall provide written notification of such action to any entity that has obtained access to the pole, duct, conduit, or right of-way so that such entity may have a reasonable opportunity to add to or modify its existing attachment. Any entity that adds to or modifies its existing attachment after receiving such notification shall bear a proportionate share of the costs incurred by the owner in making such pole, duct, conduct, or right-of-way accessible.(b) An entity that obtains access to a pole, duct, conduit, or right-of-way is not required to bear any of the costs of rearranging or replacing its attachment, if such rearrangement or replacement is required as a result of an additional attachment or the modification of an existing attachment sought by any other entity, including the owner of such pole, duct, conduit, or right-of-way.[Eff ] (Auth: HRS §§ 269-6, 269-34 to 43) (Imp: HRS §§ 269-34 to 43, 47 U.S.C. §§224, 251, 252, 253 )