Haw. Code R. § 4-1-16

Current through November, 2024
Section 4-1-16 - Continuances or extensions of time

Whenever a person or agency has a right or is required to take action within the period prescribed or allowed by this chapter, by notice given under this chapter, or by an order, the board may:

(1) With or without notice, extend the period before expiration of the prescribed period; or
(2) Upon motion, permit the act to be done after the expiration of the specified period where the failure to act is clearly shown to be the result of excusable neglect.

Haw. Code R. § 4-1-16

[Eff SEP 20 1986] (Auth: HRS § 91-2) (Imp: HRS § 91-2)