Section 13.1, Smoke-control systems, is amended by adding a new subsection 13.1.12 to read as follows: "Mechanical smoke-control systems, such as those in high-rise buildings, buildings containing atria, covered mall buildings and mechanical ventilation systems utilized in smoke proof enclosures and for smoke-removal systems utilized in high-piled combustible storage occupancies, shall be maintained in an operable condition at all times. A written record of the test reports verifying the operational status of these types of systems shall be maintained and shall be made available to the AHJ, upon request."
Haw. Code R. § 12-45.2-50