Haw. Code R. § §§ 11-265.254

Current through September, 2024
Section 11-265.254 - Design and operating requirements

The owner or operator of each new waste pile on which construction commences after January 29, 1992, each lateral expansion of a waste pile unit on which construction commences after July 29, 1992, and each such replacement of an existing waste pile unit that is to commence reuse after July 29, 1992 must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal systems, in accordance with § 264.251(c), unless exempted under § 264.251(d), (e), or (f), of this chapter; and must comply with the procedures of § 265.221(b). "Construction commences" is as defined in §260.10 of this chapter under "existing facility".

Haw. Code R. §§ 11-265.254

[Eff 7/17/2017] (Auth: HRS §§ 342J-4, 342J-31, 342J-34, 342J-35) (Imp: HRS §§ 342J-4, 342J-31, 342J-34, 342J-35)
Am and Comp 9/30/2018
Comp 6/25/2020
Am and comp 6/7/2021
Am and comp 1/29/2024