(1) The base maps shall be a reproduction of the Georgia Department of Transportation county maps, with all planimetric map information subdued with a 60%-133 point line screen, on a scale of one inch to one mile.(2) Since Georgia Power Company (the mapping entity) utilizes maps similar to those described in the conduct of its business and since it has a fully equipped and competent mapping section, the mapping entity will: (a) Be responsible for securing, duplicating and furnishing to each electric supplier requested reproductions of the above described base maps necessary to cover its service area for the purpose of entering the location of its lines from records or field check data.(b) Transfer the line locations furnished by electric suppliers, including its own, to master maps printed on mylar. The lines of various power suppliers shall be identified as shown on the attached legend.(c) Furnish the electric suppliers a black line print of each master mylar map upon transfer of all line locations to the said map for verification by the electric suppliers that the information shown is a true and correct representation of the line locations of the electric suppliers. Upon verification, the master mylar map will be presented to the electric suppliers for signature certification that the information is correct. A film sepia copy of the certified master mylar map will be filed with the Commission forthwith.(d) Furnish an electric supplier upon request any specified reproduction of the maps of its service area at a cost to the electric supplier for reproduction expenses only.(3) Every electric supplier, and the mapping entity, shall exchange such mapping data and provide such maps on an expeditious schedule, and the Commission may enforce this requirement by appropriate order upon complaint or on its own motion.Ga. Comp. R. & Regs. R. 515-11-1-.04
Ga. L. 1973, Sec. 11, 12, pp. 217, 218; 1975, Sec. 2, p. 406.
Original Rule was filed on December 29, 1975; effective January 1, 1976, as specified by Ga. L. 1975, p. 411.