EPD will approve certificates for qualified new alternative fuel medium-duty and new alternative fuel heavy-duty vehicle purchases in accordance with procedures specified by the Director of EPD or his designee. Application by the owner must be made with EPD to initiate this certification. The EPD certification will be contingent on documents provided by the manufacturer and/or owner of the vehicle that the engine in said vehicle is certified or verified by the EPA to operate on an alternative fuel as defined in O.C.G.A. § 48-7-29.18 and § 48-7-29.19.
Ga. Comp. R. & Regs. R. 391-3-25-.06
O.C.G.A. § 48-7-29.18, and § 48-7-29.19.