Ga. Comp. R. & Regs. 391-3-12-.05

Current through Rules and Regulations filed through October 17, 2024
Rule 391-3-12-.05 - Drilling Standards

The applicable recommended practices of the American Petroleum Institute in drilling, casing, cementing, well testing and the like shall be followed where practicable. When drilling into a structure suspected of holding gas, blow out preventers shall be used.

Ga. Comp. R. & Regs. R. 391-3-12-.05

Ga. Code 93-809; Ga. L. 1972, p. 1015 et seq.

Original Rule entitled "Drilling Standards" was filed and effective on July 20, 1965 as 390-3-.05 (Rule and Regulations of the Department of Mines, Mining and Geology.)
Amended: Rule renumbered as 391-3-12-.05. Filed December 22, 1980; effective January 11, 1981.