D.C. Mun. Regs. tit. 27, r. 27-2612

Current through Register Vol. 71, No. 49, December 6, 2024
Rule 27-2612 - EVALUATION OF CONTRACTOR PERFORMANCE
2612.1

The contract administrator shall evaluate contractor performance and prepare a performance report for each construction contract of ten thousand dollars ($10,000) or more in the following circumstances:

(a) When any element of performance was either unsatisfactory or outstanding;
(b) When the contract was terminated for default; or
(c) When the contract was terminated for the convenience of the District.
2612.2

The contract administrator shall prepare the evaluation performance report at the time of final acceptance of the work, at the time of contract termination, or at other times determined appropriate by the contracting officer.

2612.3

If the contract administrator concludes that a contractor's overall performance was unsatisfactory, the contracting officer shall advise the contractor in writing that a report of unsatisfactory performance is being prepared and shall state the basis for the report.

2612.4

If, after receiving the contract administrator's report, the contractor submits any written comments, the contract administrator shall include them in the report, consider them in resolving any alleged factual discrepancies, and make any appropriate changes in the report. The contracting officer shall include the performance report in the contract file.

2612.5

Before making a determination of responsibility in accordance with chapter 22 of this title, the contracting officer may consider performance reports from any agency or other entity of the District.

D.C. Mun. Regs. tit. 27, r. 27-2612

Final Rulemaking published at 35 DCR 1585 (February 26, 1988)