When exercising an option, the contracting officer shall provide written notice to the contractor within the time period specified in the contract.
D.C. Mun. Regs. tit. 27, r. 27-2008
When exercising an option, the contracting officer shall provide written notice to the contractor within the time period specified in the contract.
D.C. Mun. Regs. tit. 27, r. 27-2008