Current through Register Vol. 71, No. 49, December 6, 2024
Rule 25-C706 - ISSUANCE OF NEW AND RENEWAL FACILITY LICENSES -EXISTING FACILITY, NEW CONSTRUCTION, RENOVATION, AND RETROFITTING OF SWIMMING POOLS, SPA POOLS, OR SAUNAS FACILITIES706.1 An applicant or licensee shall submit properly prepared plans and specifications to the Department of Health for review and approval, as specified in Section 705, at least thirty (30) calendar days before:
(a) Opening a new or existing swimming pool, spa pool, or sauna;(b) Building a new swimming pool, spa pool, or sauna facility;(c) Renovating or retrofitting an existing swimming pool, spa pool, or sauna; or(d) Changing the type of swimming pool, spa pool, or sauna facility's operation.706.2 The Department shall issue an aquatic facility license after an applicant has:
(a) Submitted a properly completed application provided by the Department;(b) Paid all required fees;(c) Obtained required approvals of documents specified in Sections 701.5, 701.6, 702.4, and 705; and(d) Passed a preoperational inspection required in Subsection 710.1.D.C. Mun. Regs. tit. 25, r. 25-C706
Final Rulemaking published at 64 DCR 5359 (6/9/2017)