Browse as ListSearch Within- Rule 25-B1400 - MATERIALS - APPROVED MATERIALS, USE*
- Rule 25-B1401 - DESIGN, CONSTRUCTION, AND INSTALLATION - APPRO VED SYSTEM AND CLEANABLE FIXTURES*
- Rule 25-B1402 - DESIGN, CONSTRUCTION, AND INSTALLATION - HANDWASHING SINKS, WATER TEMPERATURE, AND FLOW
- Rule 25-B1403 - DESIGN, CONSTRUCTION AND INSTALLATION - TOILETS AND URINALS
- Rule 25-B1404 - DESIGN, CONSTRUCTION AND INSTALLATION - SERVICE SINKS
- Rule 25-B1405 - DESIGN, CONSTRUCTION, AND INSTALLATION - BACKFLOW PREVENTION, AIR GAP*
- Rule 25-B1406 - DESIGN, CONSTRUCTION, AND INSTALLATION - BACKFLOW PREVENTION DEVICE, DESIGN STANDARD
- Rule 25-B1407 - DESIGN, CONSTRUCTION, AND INSTALLATION - CONDITIONING DEVICE, DESIGN
- Rule 25-B1408 - NUMBERS AND CAPACITIES - BACKFLOW PREVENTION DEVICE, WHEN REQUIRED*
- Rule 25-B1409 - NUMBERS AND CAPACITIES - BACKFLOW PREVENTION DEVICE, CARBONATOR*
- Rule 25-B1410 - LOCATION AND PLACEMENT BACKFLOW PREVENTION DEVICE
- Rule 25-B1411 - LOCATION AND PLACEMENT - CONDITIONING DEVICE
- Rule 25-B1412 - OPERATION AND MAINTENANCE - PROHIBITING A CROSS CONNECTION*
- Rule 25-B1413 - OPERATION AND MAINTENANCE - SCHEDULING INSPECTION AND SERVICE FOR A WATER SYSTEM DEVICE
- Rule 25-B1414 - OPERATION AND MAINTENANCE - WATER RESERVOIR OF FOGGING DEVICES, CLEANING*
- Rule 25-B1415 - OPERATION AND MAINTENANCE - SYSTEM MAINTAINED IN GOOD REPAIR*