Current through Register Vol. 71, No. 49, December 6, 2024
Rule 22-A4403 - REVIEW FACTORS4403.1The recommendations of the review panel and the award decisions of the Director shall be based on the following criteria:
(a) Feasibility of the project;(b) Soundness of research design, statistical technique, and procedures and methodology, if appropriate;(c) Theoretical and technical soundness of the proposed plan of operation including the extent to which: (1) The objectives of the proposed project are clearly defined and clearly stated;(2) The proposed project activities appear likely to reach objectives;(3) The proposed project would contribute to the achievement of the grant's stated policy objectives; and(4) Provisions are made for adequate evaluation of the effectiveness of the project and for determining the extent to which the objectives are accomplished;(d) Sufficiency of size, scope, and duration of the project to secure productive results;(e) Expertise to perform the work, including past performance;(f) Adequacy of resources;(g) Reasonableness of estimated cost in relation to anticipated results; and(h) Other factors as identified in writing by the Director prior to the award of the grant.D.C. Mun. Regs. tit. 22, r. 22-A4403
Final Rulemaking published at 54 DCR 11052 (November 16, 2007)