The Library shall develop an independent cost estimate for all requirements for supplies, services and construction totaling in excess of one hundred thousand dollars ($100,000).
The government cost estimate shall be realistic based on the requirement and not on the budget and shall not be disclosed to anyone outside the Library.
D.C. Mun. Regs. tit. 19, r. 19-4304