D.C. Mun. Regs. tit. 14, r. 14-5759

Current through Register Vol. 71, No. 49, December 6, 2024
Rule 14-5759 - REPAIR PROCEDURE
5759.1

Upon receipt of a repair request from a tenant, or in the case of a Project Owner initiated repair, the Project Owner shall inspect the unit to determine the repair required. If the repair cannot be completed during the first visit, repairs shall be scheduled for a later time, within a reasonable time period.

5759.2

When repair work is completed, th e tenant shall be required to sign a Project Owner form indicating that the work was performed and indicating whether the repair work was satisfactory or unsatisfactory.

5759.3

In the event the premises are rendered uninhabitable, as determined by the Project Owner, as a result of damages to the premises that create a hazard to life, health, or safety of the occupant, the following steps shall be taken:

(a) The tenant shall immediately notify the Project Owner of the damage;
(b) The Project Owner shall be responsible for repair of the unit within a reasonable time; provided, that if the damage was caused by the tenant, tenant's household or guests, the reasonable cost of the repairs shall be charged to the tenant; and
(c) The Project Owner shall offer standard alternative accommodations, if available, in circumstances where necessary repair cannot be made within a reasonable time.

D.C. Mun. Regs. tit. 14, r. 14-5759

Final Rulemaking published at 64 DCR 12956 (12/22/2017); amended by Final Rulemaking published at 66 DCR 6831 (6/7/2019)