D.C. Mun. Regs. tit. 12, r. 12-K801

Current through Register Vol. 71, No. 49, December 6, 2024
Rule 12-K801 - GENERAL

Strike Section 801.2 of the International Green Construction Code in its entirety and insert new Section 801.2 in the Green Construction Code in its place to read as follows:

801.2

Demolition and construction phase indoor air quality management plan required. An indoor air quality management plan shall be developed and submitted with permit application materials. Such plan shall address the methods and procedures to be used during design and construction to obtain compliance with Sections 802 through 805.

D.C. Mun. Regs. tit. 12, r. 12-K801

Final Rulemaking published at 67 DCR 5679 (5/29/2020)