Strike Section 401.2 of the International Green Construction Code in its entirety and insert a new Section 401.2 in the Green Construction Code in its place to read as follows:
Predesign site inventory and assessment. An inventory and assessment of the natural resources and baseline conditions of the building site shall be submitted with the construction documents. The inventory and assessment shall:
D.C. Mun. Regs. tit. 12, r. 12-K401