At the conclusion of the review process, the Director shall prepare a final report. Where appropriate, the final report shall contain recommendations for modifications to the construction or renovation proposal, or other project reviewed.
The Director shall send a copy of the final report to the following:
D.C. Mun. Regs. tit. 10, r. 10-B2405