At one time, the Foggy Bottom and Georgetown waterfronts included industrial uses such as gas works, glass companies, breweries, and warehouses. Most of these buildings were removed long ago to make way for office, retail, parks, and residential development. Some have been adapted for contemporary mixed use development. The waterfront has emerged as a major activity center, with new parkland west of the Washington Harbour complex. 2114.1
The extension of the waterfront park from Washington Harbour to the Key Bridge remains a high priority. When the proposed 10-acre waterfront park is completed, the goal of closing the one remaining gap in an otherwise continuous park extending from Hains Point to the District of Columbia line will be achieved. 2114.2
An extension of the park from Thompson Boathouse to the Kennedy Center also is planned, with separate paths for pedestrians and bicyclists along the water's edge. There are also plans to develop additional non-motorized boating facilities to supplement the Thompson Boathouse. At the present time, there is considerable unmet demand for boating and fishing facilities along this stretch of the waterfront. 2114.3
Policy NNW-2.4.1: Georgetown Waterfront
Provide a continuous linear park connection along the Potomac River waterfront in Georgetown and Foggy Bottom, including paths for pedestrians and bicyclists, fountains, seating areas, landscaping and open space, lighting, public access to the water, new non-motorized boating facilities, and fishing areas. 2114.4
Policy NNW-2.4.2: Erosion and Bank Stabilization
Work with the National Park Service to stabilize the Potomac River Banks, clean tidal flat areas, and reduce erosion along the Potomac shoreline and along Rock Creek. 2114.5
Action NNW-2.4.A: Waterfront Park Improvements
Complete the waterfront park and promenade west of Washington Harbour, including an extension of the bicycle and pedestrian path and parkway from the Thompson Boat House to the Kennedy Center. 2114.6
The provisions of Title 10, Part A of the DCMR accessible through this web interface are codification of the District Elements of the Comprehensive Plan for the National Capital. As such, they do not represent the organic provisions adopted by the Council of the District of Columbia. The official version of the District Elements only appears as a hard copy volume of Title 10, Part A published pursuant to section 9 a of the District of Columbia Comprehensive Plan Act of 1994, effective April 10, 1984 (D.C. Law 5-76; D.C. Official Code § 1 -301.66)) . In the event of any inconsistency between the provisions accessible through this site and the provisions contained in the published version of Title 10, Part A, the provisions contained in the published version govern. A copy of the published District Elements is available www.planning.dc.gov.