Current through Register Vol. 28, No. 4, October 1, 2024
Section 101-C-6.0 - Guidance Regarding Activities Within The Port Of Wilmington6.1 All proposed manufacturing uses within the footprint of the Port of Wilmington are not in any way exempted from permitting requirements and must apply for and be issued a Coastal Zone Act permit if otherwise applicable.6.2 Proposed uses within the Port of Wilmington which constitute heavy industry uses are prohibited.6.3 The regulations do not prohibit or restrict activities involving containerized, palletized, or otherwise confined materials at any location within the Diamond State Port Corp. Bulk products, once off-loaded within the designated area, may be stored, transported, or otherwise used throughout the Port, subject to all other appropriate local, state and federal statutory and regulatory provisions.6.4 The boundary of the Port of Wilmington is the area beginning at the intersection of the right of way of US Route I-495 and the southern shore of the Christina River; thence southward along said I-495 right of way until the said I-495 right-of-way intersects the Reading Railroad Delaware River Extension; thence southeast along the said Reading Railroad Delaware River Extension to its point of intersection with the Conrail Railroad New Castle cutoff; thence southward along the Conrail Railroad New Castle cutoff until it intersects the right of way of U.S. Route I-295; thence eastward along said I-295 right of way until the said I-295 right of way intersects the western shore of the Delaware River; thence northward along the western shore of the Delaware River as it exists now to the confluence of the Christina and Delaware Rivers; thence westward along the southern shore of the Christina River to the beginning point of the intersection of the said I-495 right of way and the Southern shore of the Christina River.7 Del. Admin. Code § app C § 101-C-6.0
23 DE Reg. 222 (9/1/2019) (final)