Article 1. The nonpoint source nitrogen load in the entire watershed shall be reduced by 55 percent from the 1997-2003 baseline level. This shall result in reducing the yearly-median total nitrogen load from 226 pounds per day to 102 pounds per day.
Article 2. The nonpoint source phosphorus load in the entire watershed shall be reduced by 55 percent from the 1997-2003 baseline level. This shall result in reducing the yearly-median total phosphorous load from 13.5 pounds per day to 6.1 pound per day.
Article 3. Based upon water quality model runs and assuming implementation of reductions identified by Articles 1 through 3, DNREC has determined that, with an adequate margin of safety, water quality standards will be met in Pocomoke River.
Article 4. Implementation of this TMDL Regulation shall be achieved through development and implementation of a Pollution Control Strategy. The Strategy will be developed by DNREC in concert with the Tributary Action Teams, other stakeholders, and the public.
7 Del. Admin. Code § 7415-2.0
10 DE Reg. 1041 (12/01/06)