Article 1. The nonpoint source nitrogen load in the entire watershed shall be capped at the 2001-2003 baseline level. This shall result in a yearly-average total nitrogen load of 1,359 pounds per day.
Article 2. The nonpoint source phosphorus load in the entire watershed shall be reduced by 40 percent from the 2001-2003 baseline level. This shall result in reducing the yearly-average total phosphorous load from 127 pounds per day to 75.9 pound per day.
Article 3. Based upon water quality model runs and assuming implementation of reductions identified by Articles 1 through 3, DNREC has determined that, with an adequate margin of safety, water quality standards will be met in Choptank River.
Article 4. Implementation of this TMDL Regulation shall be achieved through development and implementation of a Pollution Control Strategy. The Strategy will be developed by DNREC in concert with the Tributary Action Teams, other stakeholders, and the public.
7 Del. Admin. Code § 7413-2.0
10 DE Reg. 1041 (12/01/06)