Article 1. The nonpoint source nitrogen load in the entire Army Creek watershed shall be reduced by 40 percent from the 2002-2005 baseline level. This shall result in a yearly-average total nitrogen load of 24.3 pounds per day.
Article 2. The nonpoint source phosphorous load in the entire Army Creek watershed shall be reduced by 40 percent from the 2002-2005 baseline level. This shall result in a yearly-average total phosphorous load of 2.04 pounds per day.
Article 3. The nonpoint source enterococcus bacteria load in the entire Army Creek watershed shall be reduced by 39 percent from the 1997-2005 baseline level.
Article 4. Based upon water quality model runs and assuming implementation of reductions identified by Article 1 through Article 3 above, DNREC has determined that, with an adequate margin of safety, water quality standards will be met in the Army Creek.
Article 5. Implementation of this TMDLs Regulation shall be achieved through the development and implementation of a Pollution Control Strategy. The Strategy will be developed by DNREC in concert with the Tributary Action Teams, other stakeholders, and the public.
7 Del. Admin. Code § 7416-2.0