Construction Permit Fee Schedule
Tank Size | Substance Stored | Construction Fee |
Greater than or equal to 12,499 gallons and less than 40,000 gallons | Regulated substance other than diesel, heating fuel or kerosene | $1,500.00 |
Greater than or equal to 40,000 gallons | All regulated substance | $3,750.00 |
Greater than or equal to 12,499 gallons and less than 40,000 gallons | Ag/Farm ASTs | $1,500.00 *Does not apply if approved Best Management Practice is on file with the Department |
Greater than or equal to 40,000 gallons | Ag/Farm ASTs | $3,750.00 |
Note: An AST which was Out of Service or permanently closed prior to June 11, 2004 and is intended to be placed into service is subject to the above construction permit fee schedule.
7 Del. Admin. Code § 1352-B-1.0
17 DE Reg. 750 (1/1/2014)
20 DE Reg. 815 (4/1/2017)
27 DE Reg. 536 (1/1/2024) (Final)