Section 1302-265-G-265.112 - Closure Plan; Amendment of Plan(a) Written plan. By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility to provisions of this section, the owner or operator of a hazardous waste management facility must have a written closure plan. Until final closure is completed and certified in accordance with § 265.115, a copy of the most current plan must be furnished to the Secretary upon request, including request by mail. In addition, for facilities without approved plans, it must also be provided during site inspections, on the day of inspection, to any officer, employee, or representative of the DNREC who is duly designated by the Secretary.(b) Content of plan. The plan must identify steps necessary to perform partial and/or final closure of the facility at any point during its active life. The closure plan must include, at least: (1) A description of how each hazardous waste management unit at the facility will be closed in accordance with § 265.111; and(2) A description of how final closure of the facility will be conducted in accordance with § 265.111. The description must identify the maximum extent of the operation which will be unclosed during the active life of the facility; and(3) An estimate of the maximum inventory of hazardous wastes ever on-site over the active life of the facility and a detailed description of the methods to be used during partial and final closure, including, but not limited to methods for removing, transporting, treating, storing or disposing of all hazardous waste, identification of and the type(s) of off-site hazardous waste management unit(s) to be used, if applicable; and(4) A detailed description of the steps needed to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during partial and final closure including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and(5) A detailed description of other activities necessary during the partial and final closure periods to ensure that all partial closures and final closure satisfy the closure performance standards, including, but not limited to, ground-water monitoring, leachate collection, and run-on and run-off control; and(6) A schedule for closure of each hazardous waste management unit and for final closure of the facility. The schedule must include, at a minimum the total time required to close each hazardous waste management unit and the time required for intervening closure activities which will allow tracking of the progress of partial and final closure. (For example, in the case of a landfill unit, estimates of the time required to treat or dispose of all hazardous waste inventory and of the time required to place a final cover must be included.); and(7) An estimate of the expected year of final closure for facilities that use trust funds to demonstrate financial assurance under § 265.143 or § 265.145 and whose remaining operating life is less than twenty years, and for facilities without approved closure plans.(8) For facilities where the Secretary has applied alternative requirements at a regulated unit under §§ 265.90 (f), 265.110(d), and/or 265.140(d), either the alternative requirements applying to the regulated unit, or a reference to the enforceable document containing those alternative requirements.(c) Amendment of plan. The owner or operator may amend the closure plan at any time prior to the notification of partial or final closure of the facility. An owner or operator with an approved closure plan must submit a written request to the Secretary to authorize a change to the approved closure plan. The written request must include a copy of the amended closure plan for approval by the Secretary. (1) The owner or operator must amend the closure plan whenever: (i) Changes in operating plans or facility design affect the closure plan, or(ii) There is a change in the expected year of closure, if applicable, or(iii) In conducting partial or final closure activities, unexpected events require a modification of the closure plan.(iv) The owner or operator requests the Secretary to apply alternative requirements to a regulated unit under §§ 265.90 (f), 265.110(d), and/or 265.140(d).(2) The owner or operator must amend the closure plan at least 60 days prior to the proposed change in facility design or operation, or no later than 60 days after an unexpected event has occurred which has affected the closure plan. If an unexpected event occurs during the partial or final closure period, the owner or operator must amend the closure plan no later than 30 days after the unexpected event. These provisions also apply to owners and operators or surface impoundments and waste piles who intended to remove all hazardous wastes at closure, but are required to close as landfills in accordance with § 265.310.(3) An owner or operator with an approved closure plan must submit the modified plan to the Secretary at least 60 days prior to the proposed change in facility design or operation, or no more than 60 days after an unexpected event has occurred which has affected the closure plan. If an unexpected event has occurred during the partial or final closure period, the owner or operator must submit the modified plan no more than 30 days after the unexpected event. These provisions also apply to owners or operators of surface impoundments and waste piles who intended to remove all hazardous wastes at closure but are required to close as landfills in accordance with § 265.310. If the amendment to the plan is a Class 2 or 3 modification according to the criteria in § 122.42, the modification to the plan will be approved according to the procedures in § 265.112 (d)(4).(4) The Secretary may request modifications to the plan under the conditions described in paragraph (c)(1) of this section. An owner or operator with an approved closure plan must submit the modified plan within 60 days of the request from the Secretary, or within 30 days if the unexpected event occurs during partial or final closure. If the amendment is considered a Class 2 or 3 modification according to the criteria in § 122.42, the modification to the plan will be approved in accordance with the procedures in § 265.112 (d)(4).(d) Notification of partial closure and final closure. (1) The owner or operator must submit the closure plan to the Secretary at least 180 days prior to the date on which he expects to begin closure of the first surface impoundment, waste pile, land treatment, or landfill unit, or final closure if it involves such a unit, whichever is earlier. The owner or operator must submit the closure plan to the Secretary at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace. The owner or operator must submit the closure plan to the Secretary at least 45 days prior to the date on which he expects to begin final closure of a facility with only tanks, container storage, or incinerator units. Owners or operators with approved closure plans must notify the Secretary in writing at least 60 days prior to the date on which he expects to begin closure of a surface impoundment, waste pile, landfill, or land treatment unit, or final closure of a facility involving such a unit. Owners or operators with approved closure plans must notify the Secretary in writing at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace. Owners or operators with approved closure plans must notify the Secretary in writing at least 45 days prior to the date on which he expects to begin final closure of a facility with only tanks, container storage, or incinerator units.(2) The date when he "expects to begin closure" must be either: (i) Within 30 days after the date on which any hazardous waste management unit receives the known final volume of hazardous wastes, or, if there is a reasonable possibility that the hazardous waste management unit will receive additional hazardous wastes, no later than one year after the date on which the unit received the most recent volume of hazardous waste. If the owner or operator of a hazardous waste management unit can demonstrate to the Secretary that the hazardous waste management unit or facility has the capacity to receive additional hazardous wastes and he has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all interim status requirements, the Secretary may approve an extension to this one-year limit; or(ii) For units meeting the requirements of § 265.113 (d), no later than 30 days after the date on which the hazardous waste management unit receives the known final volume of nonhazardous wastes, or if there is a reasonable possibility that the hazardous waste management unit will receive additional nonhazardous wastes, no later than one year after the date on which the unit received the most recent volume of nonhazardous wastes. If the owner or operator can demonstrate to the Secretary that the hazardous waste management unit has the capacity to receive additional nonhazardous wastes and he has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all applicable interim status requirements, the Secretary may approve an extension to this one-year limit.(3) The owner or operator must submit his closure plan to the Secretary no later than 15 days after: (i) Termination of interim status except when a permit is issued simultaneously with termination of interim status; or(ii) Issuance of a judicial decree or final order under 7 Del.C., § 6309 to cease receiving hazardous wastes or close.(4) The Secretary will provide the owner or operator and the public, through a newspaper notice, the opportunity to submit written comments on the plan and request modifications to the plan no later than 30 days from the date of the notice. He will also, in response to a request or at his own discretion, hold a public hearing whenever such a hearing might clarify one or more issues concerning a closure plan. The Secretary will give public notice of the hearing at least 30 days before it occurs. (Public notice of the hearing may be given at the same time as notice of the opportunity for the public to submit written comments, and the two notices may be combined). The Secretary will approve, modify, or disapprove the plan within 90 days of its receipt. If the Secretary does not approve the plan he shall provide the owner or operator with a detailed written statement of reasons for the refusal and the owner or operator must modify the plan or submit a new plan for approval within 30 days after receiving such written statement. The Secretary will approve or modify this plan in writing within 60 days. If the Secretary modifies the plan, this modified plan becomes the approved closure plan. The Secretary must assure that the approved plan is consistent with §§ 265.111 through 265.115 and the applicable requirements of Subpart F of this part, and §§ 265.197, 265.228, 265.258, 265.280, 265.310, 265.351, 265.381, 265.404, and 265.1102. A copy of the modified plan with a detailed statement of reasons for the modifications must be mailed to the owner or operator.(e) Removal of wastes and decontamination or dismantling of equipment. Nothing in this section shall preclude the owner or operator from removing hazardous wastes and decontaminating or dismantling equipment in accordance with the approved partial or final closure plan at any time before or after notification of partial or final closure.
(f) Tank Closure at less than 90 day/180 day generator sites (1) The owner or operator of a tank used to accumulate hazardous waste under the requirements of Part 262 of these regulations at less than 90 day generator sites, or at 180/270 day generator sites with a tank capacity greater than 1000 gallons, must submit a written closure plan to the Secretary for approval at least 45 days prior to the date on which he expects to begin closure of one or more hazardous waste tank systems, so as to close his tank(s) in a manner that: (a) Minimizes the need for further maintenance; and(b) Controls, minimizes or eliminates, to the extent necessary to protect human health and the environment, post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition products to the ground or surface waters or to the atmosphere; and(c) Complies with the closure requirements of this section.(2) At a minimum the plan shall identify the steps necessary to perform final closure of each tank system to be removed from hazardous waste service. The plan is to include: (a) A description of each hazardous waste tank system to be closed and how each hazardous waste tank system will be closed to achieve the requirements of § 265.112 (f)(1); and(b) A detailed description of the steps necessary to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during closure, including but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and the criteria for determining the extent of decontamination necessary to satisfy the plan's closure performance standard; and(c) A detailed description of other activities necessary during the closure period to ensure the closure satisfies the plan's stated closure performance standard; and(d) A schedule for closure for each hazardous waste tank system; and(e) Provisions if the closure performance standard cannot be achieved.(3) At closure of a tank system, the owner or operator must remove or decontaminate all waste residues, contaminated containment system components, contaminated soils, and structures and equipment contaminated with waste. By removing all hazardous waste or hazardous constituents during closure, the owner or operator may generate hazardous waste and must handle that hazardous waste in accordance with all applicable requirements of Part 262 of these regulations unless § 261.3 (d) of these regulations applies.(4) If the owner or operator cannot demonstrate that the closure performance standard can be achieved or that not all contaminated soils can be practicably removed or decontaminated as required in paragraph (3) of this section, then the owner or operator must close the tank system and perform post-closure care in accordance with the closure and post-closure care requirements that apply to landfills. In addition, for the purposes of closure, post-closure, and financial responsibility, such a tank system is then considered to be a landfill and the owner or operator must meet all of the requirements for landfills specified in Subparts G and H of part 264.(5) Within 60 days of completion of closure of each hazardous waste tank system, the owner or operator must submit to the Secretary, a written certification that the hazardous waste tank system was closed in accordance with the specifications in the approved closure plan. The certification must be signed by the owner or operator. Documentation supporting the certification must be furnished to the Secretary upon request. (Amended August 29, 1988; August 10, 1990; July 26, 1994, August 1, 1995, August 23, 1999)
7 Del. Admin. Code § 1302-265-G-265.112