Before transporting hazardous waste or offering hazardous waste for transportation off-site, a generator must package the waste in accordance with the applicable Department of Transportation regulations on packaging under 49 CFR Parts 173, 178, and 179.
7 Del. Admin. Code § 1302-262-C-262.30
24 DE Reg. 711 (1/1/2021)(final)