Both the owner and the operator must sign the RAP application and any required reports according to Section 122.11 (a), (b), and (c). In the application, both the owner and the operator must also make the certification required under Section 122.11 (d)(1). However, the owner may choose the alternative certification under Section 122.11 (d)(2) if the operator certifies under Section 122.11 (d)(1).
7 Del. Admin. Code § 1302-122-H-122.105