Current through Reigster Vol. 28, No. 6, December 1, 2024
Section 1302-122-G-122.71 - Operation during interim status(a) During the interim status period the facility shall not: (1) Treat, store, or dispose of hazardous waste not specified in Part A of the permit application;(2) Employ processes not specified in Part A of the permit application; or(3) Exceed the design capacities specified in Part A of the permit application.(b) Interim status standards. During interim status, owners or operators shall comply with the interim status standards at Part 265.7 Del. Admin. Code § 1302-122-G-122.71