Front-end capital contributions shall be required from all new connections to recover, at least in part, the cost of constructing conveyance, treatment, and disposal facilities incurred by the utility where applicable.
26 Del. Admin. Code § 6002-6.0
Front-end capital contributions shall be required from all new connections to recover, at least in part, the cost of constructing conveyance, treatment, and disposal facilities incurred by the utility where applicable.
26 Del. Admin. Code § 6002-6.0