FORM 1
SCHEDULE 1: DEVELOPMENT OF RATE AND SUPPORTING DATA
Item | 11/1/XXXX-4/30/XXXX | |
1 | Net Utility Plant Additions (Schedule 1A and Schedule 2) | $ |
2 | Net Accumulated Depreciation Reserve Change (Schedule 2A) | $ |
3 | Net Change in Rate Base (Line 1 + Line 2) | $ |
4 | Pre-Tax Rate of Return (Schedule 1A) | __% |
5 | Semi-Annual Pre-Tax Rate of Return (Line 4/ 2) | __% |
6 | Semi-Annual Investment Cost Recovery (Line 3 * Line 5) | $ |
7 | Semi-Annual Depreciation Expense (Schedule 2A) | $ |
8 | Semi-Annual DSIC/UFRC Revenue Requirement (Line 6 + Line 7) | $ |
8A | Total Over-/Undercollection from Previous DSIC/UFRC (Schedule 1B) | $ |
9 | Total Semi-Annual DSIC/UFRC Revenue Requirement (Line 8 + Line 8A) | $ |
10 | Semi-Annual Projected Total Revenues (for DSIC) Semi-Annual Projected Distribution Revenues (for UFRC) | $ |
11 | Projected DSIC/UFRC Rate Increase (Line 9/Line 10) | ___% |
FORM 2
SCHEDULE 1A: CAPITAL STRUCTURE APPROVED IN MOST RECENT GENERAL/BASE RATE CASE
Capital Structure in PSC Docket No. XX-XXX | |||||
% | Cost | Weighted Cost | Revenue Multiplier | Pre-Tax Cost | |
Cost of Debt | XX.XX% | X.XX% | X.XX% | X.XXXXX | X.XX% |
Cost of Equity | XX.XX% | X.XX% | X.XX% | X.XXXXX | X.XX% |
100% | X.XX% | X.XX% |
FORM 3
SCHEDULE 1B: OVER/UNDERCOLLECTIONS FROM PREVIOUS DSIC/UFRC FILINGS
Docket No. | Over/(Under)Collection |
XX-XXX | $______________ |
XX-XX | $______________ |
FORM 4
SCHEDULE 2: PROJECTS PLACED INTO SERVICE AND/OR RETIRED
Utility Plant in Service 11/1/XX - 4/30/XX | ||||
Project Name | Description | Project No. | DSIC/UFRC Amount(net of CIAC) | Retirement Cost |
Rt. 13 Street Widening | Relocate water/gas main | XXXXX | $___________ | $___________ |
Rt. 7 mall construction | Relocate gas line | XXXXX | $___________ | $___________ |
I-95 lane addition | Relocate gas line | XXXXX | $___________ | $___________ |
Old North Rd. repair | Relocate meter | XXXXX | $___________ | $___________ |
New Street road repair | Relocate meter | XXXXX | $___________ | $___________ |
Total | $___________ | $___________ | ||
Net Total | $___________ |
FORM 5
SCHEDULE 2A: NET ACCUMULATED DEPRECIATION
Net Additions to Plant and Depreciation Expense 11/1/XX - 4/30/XX | ||||
Account Name | FERC/NARUC Account No. | Amount | Depreciation Rate | Depreciation Amount |
Mains | XXXXX | $__________ | X.XX% | $___________ |
Meters | XXXXX | $__________ | X.XX% | $___________ |
Lines | XXXXX | $__________ | X.XX% | $___________ |
TOTAL | $______(Schedule 2) | $___________ | ||
Semi-Annual Depreciation Expense | $___________ |
Accumulated Depreciation Reserve Change | |
Semi-Annual Depreciation Expense (above) | $(________________) |
Retirements (Schedule 2) | $_________________ |
TOTAL | $_________________ |
26 Del. Admin. Code § 1009-6.0