Owner Performed Testing, Inspection, and Maintenance of Fire Suppression Systems As Required by Regulation 703, Chapter 1 and the Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems NFPA 25, 2008 Edition

This brief summary of periodic tests, inspections, and maintenance is not all inclusive, and, to assist in the performance of these services, the user is advised to purchase the applicable documents from NFPA (1-800-344-3555). These periodic tests, inspections, and maintenance may be performed by the owner or the owner's maintenance staff. A log book must be maintained by the owner for each system. The log book must include the date the service was performed, the type of service performed, and the person performing the service. An asterisk (*) denotes servicing which must be performed at least annually (once a year) by a company licensed by the Office of State Fire Marshal, Licensing Division, (302) 739-4394.

ItemActivityFrequencyServiceSection #
General
Gauges, Pressure Inspection *Monthly Wet System § 5.2.4.1
*Weekly Dry, Preaction, Deluge Systems § 5.2.4.2
Control Valves Inspection *Weekly Valves (not supervised or secured) § 12.3.2.1
*Monthly supervised and secured Valves § 12.3.2.1.1
Testing *Annual Operated though its full range § 12.3.3.1
Alarm Devices Testing *Semiannual Vane type devices § 5.3.3.
Testing *Quarterly Wet System: flow thru inspectors test § 5.3.3.3
Dry/Preaction/Deluge: use bypass § 5.3.3.5
Fire Dept Conn Inspection *Quarterly Visible, accessible, operating condition § 12.7
Alarm Valves Inspection *Monthly Free of damage, leakage, in proper position § 12.4.1.1
Backflow Prevention Assemblies
Reduced Pressure Inspection *Weekly Differential sensing valve relief port § 12.6.1.2
R.P. Detector Inspection *Weekly Differential sensing valve relief port § 12.6.1.2
Main Drain Testing *Quarterly Test to check condition of water supply § 12.6.1
Water Flow Alarm Testing *Quarterly Test in accordance with manufacturer § 12.2.7
Preaction/Deluge Valves
Enclosure Inspection Daily In cold weather only, maintain 40 degrees § 12.4.3.1
Valve Exterior Inspection *Monthly Free of damage, leakage, trim valves set properly, electrical components operational 12.4.3.1.6
Dry Valves/Quick-Opening Devices
Enclosure Inspection Daily In cold weather only, maintain 40 degrees § 12.4.4.1.1
Valve Exterior Inspection *Monthly Free of damage, leakage, trim valves set properly, electrical components operational § 12.4.4.1.3
Pressure Regulating and Relief Valves
Sprinkler System Inspection *Quarterly Valves open, no leakage, proper pressure § 12.5.1.1
Hose Connection Inspection *Quarterly Valves okay, no leakage, all parts present § 12.5.2.1
Hose Rack Inspection *Quarterly Valves okay, no leakage § 12.5.3.1
Fire Pump Relief Valves
Circulation Inspection *Weekly Water flows thru valve at churn § 12.5.6.1
Pressure Inspection *Weekly Water flows thru valve at rated pressure § 12.5.6.2
Standpipes
Piping Inspection *Quarterly All parts present, operable, in good condition § 6.2.1
Inspection Monthly See Table 6.1 § 6.2.1
Hose Valve Inspection *Quarterly All parts present & in good condition § 6.2.1
Outlets Inspection Monthly See Table 6.1 § 6.2.1
Fire Pumps
Pump House Inspection *Weekly In cold weather, see Tables 8.1 § 8.1
System Inspection *Weekly See Table 8.5.3 § 8.2
Pump Operation
No Flow Testing *Weekly Electric: auto start and run 10 minutes min § 8.3.2.1
Diesel: auto start and run 30 minutes min § 8.3.2.1
Foam Water Sprinkler System
Discharge Devices Inspection *Monthly No damage/corrosion, in place w/proper aim § 11.2.5
Strainer Inspection *Quarterly Blow-down Valve, blankets/screens § 11.2.9.2
Drainage Inspection *Quarterly Free of blockage, embankments good repair § 11.2.8
Fittings/Piping Inspection *Quarterly No damage/corrosion/missing parts § 11.2.3
Hangers/Support Inspection *Quarterly No damage/corrosion, attachments secure § 11.2.4
Foam Water Sprinkler Proportioning System
Standard Pressure Inspection *Monthly No corrosion, ball drip valves free/opened § 11.2.9.5.1
Bladder Tank Inspection *Monthly No corrosion, water control valves in position § 11.2.9.5.2
Line Proportioner Inspection *Monthly No corrosion, pressure vacuum vent operable § 11.2.9.5.3
Standard Balanced Inspection *Monthly Pressure vacuum vent, sensing lines, gauges § 11.2.9.4
In-Line Balanced Inspection *Monthly Pressure vacuum vent, sensing lines, gauges § 11.2.9.5.5
Orifice Plate Inspection *Monthly Pressure vacuum vent, sensing lines, gauges § 11.2.9.5.6
Private Fire Service Mains
Hose House Inspection Quarterly Accessible, free of damage, all parts present § 7.2.2.7
Maintenance Annually Hoses and all parts in usable condition § 7.4.5
Hydrant House Inspection Quarterly Accessible, free of damage, all parts present § 7.2.2.7
Maintenance Annually Hoses and all parts in usable condition § 7.4.5
Hydrant: Wall/Dry Inspection Annually Accessible, no water in barrel, operable § 7.2.2.4
Testing Annually Flow Test, minimum one minute § 7.3.2
Maintenance Annually Lubricate stems, caps, plugs, threads § 7.4.3.1
Hydrant: Wet Inspection Annually Accessible, free of damage, operable § 7.2.2.5
Testing Annually Flow Test, minimum one minute § 7.3.2
Maintenance Annually Lubricate stems, caps, plugs, threads § 7.4.3.1
Monitor Nozzle Inspection 2 Times/Year Free of damage, no leakage, no corrosion § 7.2.2.6
Testing Annually Full range oscillation and movement § 7.3.3
Testing Annually When attached to hydrants, per NFPA 25 § 7.3.3.1
Maintenance Annually Lubricate § 7.4.4
Mainline Strainer Inspection Annually Clean, free of damage and corrosion § 7.2.2.3
Maintenance Annually Clean annually & after each use § 7.4.2
Piping:
Exposed Inspection Annually Free of damage, no leakage, no corrosion § 7.2.2.1
Testing Every 5 Years Fire Flow Test for internal conditions § 7.3.1
Underground Testing Every 5 Years Fire Flow Test for internal conditions § 7.3.1
Water Spray Fixed System
Drainage Inspection Monthly Free of blockage, embankments good repair § 10.2.8
Fittings/Piping Inspection *Quarterly No damage/corrosion/rust/missing parts § 10.2.4
Hangers/Support Inspection *Quarterly No damage/corrosion/rust/missing parts § 10.2.4
Heat/Valve Room Inspection *Monthly Maintain 40 degrees F § 10.2.1.5
Inspection Weekly In cold weather, inspect daily § 10.2.1.5
Nozzles Inspection *Monthly No damage/corrosion, in place w/proper aim § 10.2.1
Strainers Inspection *Per Mfr Flushed clear after each operation or test § 10.2.7
Water Storage Tanks
Condition/Level Inspection Monthly In cold weather only § 9.2.1
Level Maintenance Monthly regardless if water level alarm is provided § 9.3
Level Alarm Testing *2 Times/Year High and Low water level alarms tested § 9.3.5
Heating System Inspection Daily In cold weather only § 9.2.6.6
Temperature Inspection Daily Only in cold weather, maintain 40 deg. F § 9.2.3.2
Low Alarm Testing *Monthly Where provided, test in cold weather § 9.3.3
High Alarm Testing Monthl y In cold weather, test limit switches § 9.3.4
Air Pressure Inspection *Monthly In pressure tanks § 9.2.2.2
Tank Exterior Inspection *Quarterly Free of damage, no leakage, sound structure § 9.2.5.1
Tank Area/Yard Inspection Quarterly Free of combustibles, corrosion, erosion, ice § 9.2.5.2
Hoops/Grillage Inspection Annually In wooden tanks, no damage/deterioration § 9.2.5.4
Tank Surface Inspection Annually Paint/Coat/Insulation no damage/deterioration § 9.2.5.5
Maintenance Per Mfr Repaint steel tanks per manufacturer § 9.4.4
Tank Support Maintenance *Per Mfr Embankment Supported Rubberized Fabric § 9.4.6
Expansion Joints Inspection *Annually Where provided, no leaks, no cracks § 9.2.5
Sediment Maintenance *2 Times/Year Drain and/or flush tank § 9.4.5

Inspection: A visual examination to verify an item is in operating condition and free of physical damage.

Testing: A procedure used to determine the status of a system operating as intended by conducting physical checks.

Maintenance: Work performed to keep equipment operable or to make repairs.

*Servicing may be performed by an owner, but must be performed at least annually by a licensed company.

Appendix F

Table Two

Licensed Company Required

Testing, Inspection, and Maintenance of Fire Suppression Systems As Required by Part III, Chapter 1 and the Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems NFPA 25, 2002 Edition

This brief summary of periodic tests, inspections, and maintenance is not all inclusive, and, to assist in the performance of these services, the user is advised to purchase the applicable documents from NFPA (1-800-344-3555). These periodic services must be performed by a company licensed by the Office of State Fire Marshal, Licensing Division, (302) 739-4394. A log book must be maintained by the licensed company for each system. The log book must include the date the service was performed, the type of service performed, and the person performing the service. An asterisk (*) denotes servicing which may be performed by an owner, but must be performed at least annually (once a year) by a licensed company. A licensed company must forward a Certificate of Inspection to the Office of State Fire Marshal within 30 days of the annual inspection.

ItemActivityFrequencyServiceSection #
General
Gauges, Pressure Inspection *Monthly Wet System § 5.2.4.1
*Weekly Dry, Preaction, Deluge Systems § 5.2.4.2
Testing Every 5 Years Calibration Test § 5.3.2
Control Valves Inspection *Weekly Valves (not supervised or secured) § 12.3.2.1
*Monthly Supervised/Secured Valves & Tamper Sws § 12.3.2.1
Testing Annually Operate Valve - full range of motion § 12.3.3
Maintenance Annually Oil/grease valve stems, open & close § 12.4.1.3
Alarm Devices Inspection *Quarterly Free of damagell connections secure § 5.3.3.2
Testing *Quarterly Wet System: flow thru inspectors test § 5.3.3.3
Dry/Preaction/Deluge: use bypass § 5.3.3.5
Hangars Inspection Annually Inspect for damaged or loose hangars § 5.2.3
Piping Inspection Annually No damage, leakage, corrosion, etc. § 5.2.2
Sprinklers/Standard Inspection Annually No corrosion, obstructions, paint, etc § 5.2.1.1
Testing After 50 Years Submit samples to lab for test § 5.3.1.1.1.1
Testing +10 Years Repeat Every 10 years thereafter
Fast Response Testing After 20 Years Submit samples to lab for test § 5.3.1.1.1.2
+10 Years Repeat Every 10 years thereafter
High Temp Testing After 5 Years Submit samples to lab for test § 5.3.1.1.1.3
FD Connection Inspection *Quarterly Visible, accessible, operating condition § 12.7.
Alarm Valves Inspection *Monthly Free of damage, leakage, in proper position § 12.4.1.1
Inspection Every 5 Years Internal inspection § 12.4.1.2
Check Valves Inspection Every 5 Years Internal inspection § 12.4.2.1
Backflow Prevention Assemblies
Reduced Pressure Inspection *Weekly Differential sensing valve relief port § 12.6.1.2
R.P. Detector Inspection *Weekly Differential sensing valve relief port § 12.6.1.2
Entire Assembly Testing Annually Test in accordance with AHJ procedures § 12.6.2,
Main Drain Testing *Quarterly Test to check condition of water supply § 12.2.6
Water Flow Alarm Testing *Quarterly Test in accordance with manufacturer § 12.2.7
Preaction/Deluge Valves
Valve Exterior Inspection *Monthly No damage, trim valves set properly, etc § 12.4.1.3.6
Valve Interior Inspection Annually Internal inspection § 12.4.1.3.7
Strainers/Filters Inspection Every 5 Years Internal inspection § 12.4.3.1.8
Priming Water Testing Quarterly Test levels per manufacturer's instructions § 12.4.3.2.1
Low Press Alarm Testing Quarterly Test per manufacturer's instructions § 12.4.3.2.10
Full Flow Test Testing Annually In warm weather, test per manufacturer § 12.4.3.2.2
Valves Testing Annually During Full Flow Test, clean & repair interior § 12.4.3.3.2
Dry Valves/Quick-Opening Devices (Q.O.D.)
Valve Exterior Inspection *Monthly No damage, trim valves set properly, etc § 12.4.4.1.4
Valve Interior Inspection Annually Internal inspection § 12.4.4.1.5
Strainers/Filters Inspection Every 5 Years Internal Inspection § 12.4.4.1.6
Priming Water Testing Quarterly Test levels per manufacturer's instructions § 12.4.4.2.1
Low Air Alarm Testing Quarterly Test per manufacturer's instructions § 12.4.4.2.6
Q.O.D. Testing Quarterly Test per manufacturer's instructions § 12.4.4.2.4
Maintenance Annually During Trip Test, clean & repair interior § 12.4.4.3.2
Trip Test Testing Annually In warm weather, test w/valve partially open § 12.4.4.2.2
Full Flow Test Testing Every 3 Years In warm weather, test w/valve fully open § 12.4.4.2.2.2
Pressure Regulating and Relief Valves
Sprinkler System Inspection *Quarterly Valves open, no leakage, proper pressure § 12.5.1.1
Testing Annually Flow test on each valve § 12.5.1.2
Hose Connection Inspection *Quarterly Valves okay, no leakage, all parts present § 12.5.2.1
Hose Rack Inspection *Quarterly Valves okay, no leakage § 12.5.3.1
Fire Pump Relief Valves
Circulation Inspection *Weekly Water flows thru valve at churn § 12.5.6.1
Pressure Inspection *Weekly Water flows thru valve at rated pressure § 12.5.6.2
Circulation Testing Annually Valve closes per manufacturer's listing § 12.5.6.1.2
Pressure Relief Testing Annually Valve adjusted during Annual Fire Pump Test § 12.5.6.2.2
Hose Connections Testing Every 5 Years Full Flow Test per manufacturer § 12.5.2.2
Hose Rack Testing Every 5 Years Full Flow Test per manufacturer § 12.5.3.2
Obstruction Maintenance Every 5 Years Investigate to ensure piping is free of debris Table 5.1
Anti-Freeze Testing Annually Measure specific gravity of solution § 5.3.4
Standpipes
Hose Valve Outlet Inspection *Quarterly All parts present & in good condition § 6.2.1
Piping Inspection *Quarterly All parts present, operable, in good condition § 6.2.1
Cabinet Inspection Annually All parts present, operable, in good condition § 6.2.1
Hose Inspection Annually All parts present, operable, in good condition § 6.2.1
Testing Every 5 Years Per NFPA 1962 § 6.3
Testing Every 3 Years Per NFPA 1962 § 6.3
Hose Storage Inspection Annually All parts present, operable, in good condition § 6.2.1
Testing Annually Test for smooth operation § 6.3
Hose Nozzle Testing Annually Test for smooth operation § 6.3
Hydrostatic Testing Every 5 Years 200 psi for 2 hours § 6.3
Water Supply Testing Every 5 Years Flow designed volume, pressure @ remote § 6.3.1.1
Fire Pumps
Pump House Inspection *Weekly In cold weather, see Tables 8.1 & 8.5.3 § 8.2.2
System Inspection *Weekly See Table 8.5.3 § 8.2.2
Pump Operation
No Flow Testing *Weekly Electric: auto start & run 10 minutes min § 8.3.1.2
Diesel: auto start and run 30 minutes min § 8.3.1.3
Flow Testing Annually Annual Flow Test § 8.3.3
Hydraulics, Transmission Electrical, Controller, Motor, and Diesel Parts Maintenance Annually Establish preventive maintenance program, per manufacturer's instructions, on all components of the pump assembly § 8.5.3
Foam Water Sprinkler System
Discharge Devices Inspection *Monthly No damage/corrosion, in place w/proper aim § 11.2.5
Strainer Testing Annually Discharge patterns/proper location/position § 11.3.3.6
Inspection *Quarterly Blow-down Valve, blankets/screens § 11.2.7
Testing Annually After each test/remove/clean baskets/screens § 11.2.7.2
Maintenance Annually Inspect and clean after each test § 11.4
Drainage Inspection *Quarterly Free of blockage, embankments good repair § 11.2.9
Fittings/Piping Inspection *Quarterly No damage/corrosion/missing parts § 11.2.3
Hangers/Support Inspection *Quarterly No damage/corrosion, attachments secure § 11.-2.4
Complete System Testing Annually Full Automatic & Manual Operational Test § 11.3.3
Concentrate Sample Testing Annually During Annual Test refractometric check § 11.3.6
Maintenance Annually During Annual Test, submit sample per mfr § 11.2.10
Pump Maintenance Monthly Pump run, circulate foam, maintenance/mfr § 11.4.6 & 11.4.7
Foam Water Sprinkler Proportioning System
Standard Pressure Inspection *Monthly No corrosion, ball drip valves free/opened § 11.2.9.5.1
Maintenance Every 5 Yrs Disassemble/clean/reassemble ball drip valves § 11.4.3 A
Maintenance Every 10 Yr Drain/flush tank, hydro test § 11.4.3 BC
Bladder Tank Inspection *Monthly No corrosion, water control valves in position § 11.2.9.5.2
Maintenance Every 10 Yr Remove/clean sight glass, hydro test § 11.4.4
Line Proportioner Inspection *Monthly No corrosion, pressure vacuum vent operable § 11.2.9.5.3
Maintenance Every 10 Yr Drain/flush tank, tank/piping corrosion check § 11.4.5
Standard Balanced Inspection *Monthly Pressure vacuum vent, sensing lines, gauges § 11.2.9.5.4
Maintenance Every 5 Yrs Flush valves, pump/drive train/driver per mfr § 11.4.6
In-Line Balanced Inspection *Monthly Pressure vacuum vent, sensing lines, gauges § 11.2.9.5.5
Maintenance Every 5 Yrs Flush valves, pump/drive train/driver per mfr § 11.4.7 BC
Maintenance Every 10 Yr Internally inspect tank for corrosion § 11.4.7.D
Orifice Plate Inspection *Monthly Pressure vacuum vent, sensing lines, gauges § 11.2.9.5.6
Water Spray Fixed System
Fittings/Piping Inspection *Monthly No damage/corrosion/rust/missing parts § 10.2.1 &10.2.4
Hangers/Support Inspection *Monthly No damage/corrosion/rust/missing parts § 10.2.4.2
Heat/Valve Room Inspection *Monthly Maintain 40 degrees F § 10.2.1.5
Nozzles Inspection *Monthly No damage/corrosion, in place w/proper aim § 10.2.1 /10.2.5
Strainers Inspection *Per Mfr Flushed clear after each operation or test § 10.2.7
Operational Test Testing Annually Full Manual & Automatic Operational Test §T 10.1
Water Storage Tanks
Water Level Inspection *Quarterly Where a water level alarm is provided § 9.2.1
Level Alarm Testing *2Times/Year High and Low water level alarms tested § 9.33.5
Level Indicators Testing Every 5 Years Accuracy and freedom of movement § 9.3.1
Thermostats Testing Frequency per manufacturer's specifications § 9.3.2
Low Temp Alarm Testing *Monthly Where provided, test in cold weather § 9.3.3
Air Pressure Inspection *Monthly In pressure tanks § 9.2.2
Tank Exterior Inspection *Quarterly Free of damage, no leakage, sound structure § 9.2.5.1
Tank Support Maintenance *Per Mfr Embankment Supported Rubberized Fabric § 9.4.6
Expansion Joints Inspection *Annually Where provided, no leaks, no cracks § 9.2.5.3
Interior Inspection Every 5 Years Every 3 Years Free of damage Pressure tanks, & steel tanks w/out corrosion protection § 9.2.6.1.1 § 9.2.6.1.2
Sediment, Drain Maintenance *2 Times/Year Drain and/or flush tank § 9.4.5
Cathode Protection Maintenance Annually Where provided, per manufacturer
Drain Valves Maintenance Annually Cycled fully open and closed
Vent Screens Maintenance Annually Clean

Inspection: A visual examination to verify an item is in operating condition and free of physical damage.

Testing: A procedure used to determine the status of a system operating as intended by conducting physical checks.

Maintenance: Work performed to keep equipment operable or to make repairs.

*Servicing may be performed by an owner, but must be performed at least annually by a licensed company.

Appendix F - Table Three

Owner Performed

Testing, Inspection, and Maintenance of Fire Alarm Signaling Systems

as Required by Regulation 703, Chapter 1 and the National Fire Alarm Code, NFPA 72, 2007 Edition

This brief summary of periodic tests, inspections, and maintenance is not all inclusive, and, to assist in the performance of these services, the user is advised to purchase the applicable documents from NFPA (1-800-344-3555). These periodic tests, inspections, and maintenance may be performed by the owner or the owner's maintenance staff. A log book must be maintained by the owner for each system. The log book must include the date the service was performed, the type of service performed, and the person performing the service. An asterisk (*) denotes servicing which must be performed at least annually (once a year) by a company licensed by the Office of State Fire Marshal, Licensing Division, (302) 739-4394.

ItemActivityFrequencyServiceSection #/Table
Control Equipment
Fire Alarm Systems Unmonitored for Alarm Supervisory, Trouble Signals
Fuses Inspection *Weekly No damage or missing parts Table 10.3.1
Testing Quarterly Remove fuse & verify rating & supervision Table 10.4.4
Interfaced Equip Inspection *Weekly Wiring connections secure/No damage Table 10.3.1
Testing Quarterly Verify integrity & signals by operational test Table 10.4.4
Lamps & LEDs *Weekly *Weekly All lamps and LEDs illuminated Table 10.3.1
Quarterly Quarterly All lamps and LEDs illuminated Table 10.4.4
Primary (Main) Power Supply Inspection *Weekly Secured/Marked/No damage Table 10.3.1
Testing Quarterly Disconnect secondary power, max load test Table 10.4.4
Functions Testing Quarterly Full Function Test Table 10.4.4
Transponders Testing Quarterly Full Function Test Table 10.4.4
Fire Alarm Systems Monitored for Alarm Supervisory, Trouble Signals
FusesInspection*WeeklyNo damage or missing parts Table 10.3.1
Testing Quarterly Remove fuse & verify rating & supervision Table 10.4.4
Interfaced Equip Inspection Annually No damage or missing parts Table 10.3.1
Testing Annually Verify integrity & signals by operational test Table 10.4.4
Lamps & LEDs Inspection Annually No damage or missing parts Table 10.3.1
Testing Annually All lamps and LEDs illuminated Table 10.4.4
Primary (Main) Power Supply Inspection Annually No damage or missing parts Table 10.3.1
Testing Annually Disconnect secondary power, max load test Table 10.4.4
Functions Testing Annually Full Function Test Table 10.4.4
Transponders Testing Annually Full Function Test Table 10.4.4
Batteries
Lead-Acid Inspection *Monthly Electrolyte level/connections, No corrosion Table 10.3.1
Testing 2 Times/Year Discharge, Load Voltage, Specific Gravity Table 10.4.4
Testing Annually Charger Test Table 10.4.4
Nickel-Cadmium Inspection 2 Times/Year No corrosion/leakage, Connections tight Table 10.3.1
Testing 2 Times/Year Load Voltage Table 10.4.4
Testing Annually Charger Test, Discharge (30 min) Test Table 10.4.4
Primary (Dry Cell) Inspection *Monthly No corrosion/leakage, Connections tight Table 10.3.1
Testing Monthly Load Voltage Table 10.4.4
Sealed Lead-Acid Inspection *2 Times/Year No corrosion/leakage, Connections tight Table 10.3.1
Testing 2 Times/Year Load Voltage Table 10.4.4
Testing Annually Charger Test, Discharge (30 min) Test Table 10.4.4
Transient Suppressors
Lightning Protection Equipment
Inspection *2 Times/Year Per mfr/After every lightning strikes/storms Table 10.3.1 & NFPA 780
Testing Per mfr and NFPA 780
Remote Annunciators
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Verify operation & identification Table 10.4.4
Initiating Devices
Air Sampling Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Verify alarm & airflow via ports per mfr Table 10.4.4
Duct Detectors Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Verify per manufacturer Table 10.4.4
Electromechanical Releasing Device
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Nonrestorable Testing Annually Remove link, ensure operation, lubricate Table 10.4.4
Restorable Testing Annually Remove link, ensure operation, lubricate Table 10.4.4
Suppression System Switches
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Mechanical/electrical operation of switch Verify signal receipt at panel Table 10.4.4
Fire Alarm Boxes Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Operate per manufacturer Table 10.4.4
Heat Detectors/All Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Fixed-Temp Testing Annually Heat test per manufacturer Table 10.4.4
Rate-of-Rise, Rate-of-Compensation, Restorable Line, Spot Type (excluding Pneumatic Tub Type) Fixed-Temp
Testing Annually Mechanical/electrical tests/Loop resistance Table 10.4.4
Nonrestorable Line Type Fixed-Temp.
Testing After 15 Years Replace all devices or Lab test 2 per 100 Table 10.4.4
Nonrestorable Spot Type
Testing Annually Mechanical/electrical function tests Table 10.4.4
(General) Restorable Line
Testing Annually Heat source or pressure pump Table 10.4.4
Radiant Energy Fire Detectors
Inspection *Quarterly No damage/obstructions/proper position Table 10.3.1
Testing 2 Times/Year Per manufacturer and Sensitivity Tests Table 10.4.4
Smoke Detectors Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Functional Test Table 10.4.4
Testing 1st Year and Alternating Yrs Sensitivity Test (IF within listed and marked sensitivity range) Table 10.4.4
Supervisory Signal Devices
Inspection *Quarterly Secured/No damage or missing parts Table 10.3.1
Control Valve Testing Quarterly Operate valve per mfr/Verify signal receipt Table 10.4.4
High-/Low-Air Testing Quarterly Operate valve per mfr/Verify signal receipt Table 10.4.4
Room Temp Testing Quarterly Operate switch/Verify signal receipt Table 10.4.4
Water Level Testing Quarterly Operate switch/Verify signal receipt Table 10.4.4
Water Temp Testing Quarterly Operate switch/Verify signal receipt Table 10.4.4
Water Flow Testing Quarterly Flow water per NFPA 25 Table 10.4.4
Valve Tamper Sw Testing 2 Times/Year Operate switch per mfr/Verify signal receipt Table 10.4.4
Waterflow Devices
Inspection *Quarterly Secured/No damage or missing parts Table 10.3.1
Testing 2 Times/Year Operate switch per mfr/Verify signal receipt Table 10.4.4
Fire-Gas & Other Testing Annually Per manufacturer Table 10.4.4
Guard's Tour Equipment
Inspection *2 Times/Year No damage or missing parts/equipment Table 10.3.1
Testing Annual Per manufacturer Table 10.4.4
Interface Equipment
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Operational test/Verify signal receipt Table 10.4.4
Alarm Notification Appliances
Audible Devices Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Measure sound level IAW ANSI S-1.4a Table 10.4.4
Speakers Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Measure sound level IAW ANSI S-1.4a Verify Voice Clarity Table 10.4.4
Visible Devices Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Per manufacturer Table 10.4.4
Supervising Station Fire Alarm Systems - Transmitters
All Equipment Testing Annual Per mfr/operational test/verify signal receipt Table 10.4.4
DACT Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 2 lines/line seizure/trouble signal w/in 90 sec Table 10.4.4
DART Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 3 rounds-3 impulses/end-end metallic/etc Table 10.4.4
McCulloh Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 2 lines/line seizure/trouble signal w/in 90 sec Table 10.4.4
RAT Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Fault indication/trouble signal Table 10.4.4
Supervising Station Fire Alarm Systems - Receivers
All Equipment Testing Monthly Per mfr/operational test/verify signal receipt Table 10.4.4
DACR Inspection *Monthly Secured/No damage or missing parts Table 10.3.1
Testing Annual Trouble signal/verify 24-hour signals Table 10.4.4
DARR Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Verify signals for all 4 trouble conditions/etc Table 10.4.4
McCulloh Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 2 lines/line seizure/trouble signal w/in 90 sec Table 10.4.4
Two-Way RF Multiplex
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Per mfr/operational test/verify signal receipt Table 10.4.4
RASSR & RARSR Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Verify signals for all 3 trouble conditions Table 10.4.4
Private Microwave
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Verify signals for all 4 trouble conditions/etc Table 10.4.4
Engine-Driven Generator
Inspection *Weekly No damage or leakage Table 10.3.1
Testing *Weekly Verify operation NFPA 110
Uninterrupted Power Supply (UPS)
Testing *Per manufacturer and NFPA 111 Table 10.4.4
Secondary (Standby) Power Supply
Testing Annually Disconnect primary/verify trouble signal/etc Table 10.4.4
Control Panel Trouble Signals
Testing Annually Audible/Visible, Disconnect Switches, Ground-Faults, Signal Transmission Off-Site Table 10.4.4
Conductors
Metallic Testing Annually Stray Voltage, Short Circuit Faults, Ground Faults, Loop Resistance Table 10.4.4
Nonmetallic Fiber Optics/Fiber Optics Cable Power
Testing Annually Circuit Integrity, Supervision Table 10.4.4
Emergency Voice/Alarm Communications Equipment
Inspection Annually No damage or missing parts Table 10.3.1
Phone Set, Phone Jacks, Amplifier/Tone Generators, Call-In Signal Silence, Off-Hook Indicator (Ring Down), System Performance
Testing Annually Full Function Test Table 10.4.4
Special Hazard Equipment
Abort Switches, Cross-Zone Detection Circuits Matrix-Type Circuit, Release Solenoid, Squibb Release Circuit, Verified/Sequential/Counting Zone Circuit, All other devices or circuits or combinations thereof.
Testing Annually Operate switches/sensors and verify Table 10.4.4
Special Procedures
Inspection 2 Times/Year No damage or missing parts Table 10.3.1
Testing Annually Alarm Verification/Multiplex Systems Table 10.4.4
Low Power Radio (Wireless Systems)
Testing Monthly Per manufacturer Table10.4.4

Inspection: A visual examination to verify an item is in operating condition and free of physical damage.

Testing: A procedure used to determine the status of a system operating as intended by conducting physical checks.

Maintenance: Work performed to keep equipment operable or to make repairs.

*Servicing may be performed by an owner, but must be performed at least annually by a licensed company.

Appendix F - Table Four

Licensed Company Required

Testing, Inspection, and Maintenance of Fire Alarm Signaling Systems

as Required by Regulation 703, Chapter 1 and the National Fire Alarm Code, NFPA 72, 2007 Edition

This brief summary of periodic tests, inspections, and maintenance is not all inclusive, and, to assist in the performance of these services, the user is advised to purchase the applicable documents from NFPA (1-800-344-3555). These periodic services must be performed by a company licensed by the Office of State Fire Marshal, Licensing Division, (302) 739-4394. A log book must be maintained by the licensed company for each system. The log book must include the date the service was performed, the type of service performed, and the person performing the service. An asterisk (*) denotes servicing which may be performed by an owner, but must be performed at least annually (once a year) by a licensed company. A licensed company must forward a Certificate of Inspection to the Office of State Fire Marshal within 30 days of the annual inspection.

ItemActivityFrequencyServiceSection #/Table
Control Equipment
Fire Alarm Systems Unmonitored for Alarm Supervisory, Trouble Signals
Fuses Inspection *Weekly No damage or missing parts Table 10.3.1
Testing Quarterly Remove fuse & verify rating & supervision Table 10.4.4
Interfaced Equip Inspection *Weekly Wiring connections secure/No damage Table 10.3.1
Testing Quarterly Verify integrity & signals by operational test Table 10.4.4
Lamps & LEDs *Weekly *Weekly All lamps and LEDs illuminated Table 10.3.1
Quarterly Quarterly All lamps and LEDs illuminated Table 10.4.4
Primary (Main) Power Supply Inspection *Weekly Secured/Marked/No damage Table 10.3.1
Testing Quarterly Disconnect secondary power, max load test Table 10.4.4
Functions Testing Quarterly Full Function Test Table 10.4.4
Transponders Testing Quarterly Full Function Test Table 10.4.4
Fire Alarm Systems Monitored for Alarm Supervisory, Trouble Signals
FusesInspection*WeeklyNo damage or missing parts Table 10.3.1
Testing Quarterly Remove fuse & verify rating & supervision Table 10.4.4
Interfaced Equip Inspection Annually No damage or missing parts Table 10.3.1
Testing Annually Verify integrity & signals by operational test Table 10.4.4
Lamps & LEDs Inspection Annually No damage or missing parts Table 10.3.1
Testing Annually All lamps and LEDs illuminated Table 10.4.4
Primary (Main) Power Supply
Inspection Annually No damage or missing parts Table 10.3.1
Testing Annually Disconnect secondary power, max load test Table 10.4.4
Functions Testing Annually Full Function Test Table 10.4.4
Transponders Testing Annually Full Function Test Table 10.4.4
Batteries
Lead-Acid Inspection *Monthly Electrolyte level/connections, No corrosion Table 10.3.1
Testing 2 Times/Year Discharge, Load Voltage, Specific Gravity Table 10.4.4
Testing Annually Charger Test Table 10.4.4
Nickel-Cadmium Inspection 2 Times/Year No corrosion/leakage, Connections tight Table 10.3.1
Testing 2 Times/Year Load Voltage Table 10.4.4
Testing Annually Charger Test, Discharge (30 min) Test Table 10.4.4
Primary (Dry Cell) Inspection *Monthly No corrosion/leakage, Connections tight Table 10.3.1
Testing Monthly Load Voltage Table 10.4.4
Sealed Lead-Acid Inspection *2 Times/Year No corrosion/leakage, Connections tight Table 10.3.1
Testing 2 Times/Year Load Voltage Table 10.4.4
Testing Annually Charger Test, Discharge (30 min) Test Table 10.4.4
Transient Suppressors
Lightning Protection Equipment
Inspection *2 Times/Year Per mfr/After every lightning strikes/storms Table 10.3.1 & NFPA 780
Testing Per mfr and NFPA 780
Remote Annunciators
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Verify operation & identification Table 10.4.4
Initiating Devices
Air Sampling Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Verify alarm & airflow via ports per mfr Table 10.4.4
Duct Detectors Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Verify per manufacturer Table 10.4.4
Electromechanical Releasing Device
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Nonrestorable Testing Annually Remove link, ensure operation, lubricate Table 10.4.4
Restorable Testing Annually Remove link, ensure operation, lubricate Table 10.4.4
Suppression System Switches
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Mechanical/electrical operation of switch Verify signal receipt at panel Table 10.4.4
Fire Alarm Boxes Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Operate per manufacturer Table 10.4.4
Heat Detectors/All Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Fixed-Temp Testing Annually Heat test per manufacturer Table 10.4.4
Rate-of-Rise, Rate-of-Compensation, Restorable Line, Spot Type (excluding Pneumatic Tub Type) Fixed-Temp
Testing Annually Mechanical/electrical tests/Loop resistance Table 10.4.4
Nonrestorable Line Type Fixed-Temp.
Testing After 15 Years Replace all devices or Lab test 2 per 100 Table 10.4.4
Nonrestorable Spot Type
Testing Annually Mechanical/electrical function tests Table 10.4.4
(General) Restorable Line
Testing Annually Heat source or pressure pump Table 10.4.4
Radiant Energy Fire Detectors
Inspection *Quarterly No damage/obstructions/proper position Table 10.3.1
Testing 2 Times/Year Per manufacturer and Sensitivity Tests Table 10.4.4
Smoke Detectors Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annually Functional Test Table 10.4.4
Testing 1st Year and Alternating Yrs Sensitivity Test (IF within listed and marked sensitivity range) Table 10.4.4
Supervisory Signal Devices
Inspection *Quarterly Secured/No damage or missing parts Table 10.3.1
Control Valve Testing Quarterly Operate valve per mfr/Verify signal receipt Table 10.4.4
High-/Low-Air Testing Quarterly Operate valve per mfr/Verify signal receipt Table 10.4.4
Room Temp Testing Quarterly Operate switch/Verify signal receipt Table 10.4.4
Water Level Testing Quarterly Operate switch/Verify signal receipt Table 10.4.4
Water Temp Testing Quarterly Operate switch/Verify signal receipt Table 10.4.4
Water Flow Testing Quarterly Flow water per NFPA 25 Table 10.4.4
Valve Tamper Sw Testing 2 Times/Year Operate switch per mfr/Verify signal receipt Table 10.4.4
Waterflow Devices
Inspection *Quarterly Secured/No damage or missing parts Table 10.3.1
Testing 2 Times/Year Operate switch per mfr/Verify signal receipt Table 10.4.4
Fire-Gas & Other Testing Annually Per manufacturer Table 10.4.4
Guard's Tour Equipment
Inspection *2 Times/Year No damage or missing parts/equipment Table 10.3.1
Testing Annual Per manufacturer Table 10.4.4
Interface Equipment
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Operational test/Verify signal receipt Table 10.4.4
Alarm Notification Appliances
Audible Devices Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Measure sound level IAW ANSI S-1.4a Table 10.4.4
Speakers Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Measure sound level IAW ANSI S-1.4a Verify Voice Clarity Table 10.4.4
Visible Devices Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Per manufacturer Table 10.4.4
Supervising Station Fire Alarm Systems - Transmitters
All Equipment Testing Annual Per mfr/operational test/verify signal receipt Table 10.4.4
DACT Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 2 lines/line seizure/trouble signal w/in 90 sec Table 10.4.4
DART Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 3 rounds-3 impulses/end-end metallic/etc Table 10.4.4
McCulloh Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 2 lines/line seizure/trouble signal w/in 90 sec Table 10.4.4
RAT Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual Fault indication/trouble signal Table 10.4.4
Supervising Station Fire Alarm Systems - Receivers
All Equipment Testing Monthly Per mfr/operational test/verify signal receipt Table 10.4.4
DACR Inspection *Monthly Secured/No damage or missing parts Table 10.3.1
Testing Annual Trouble signal/verify 24-hour signals Table 10.4.4
DARR Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Verify signals for all 4 trouble conditions/etc Table 10.4.4
McCulloh Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Annual 2 lines/line seizure/trouble signal w/in 90 sec Table 10.4.4
Two-Way RF Multiplex
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Per mfr/operational test/verify signal receipt Table 10.4.4
RASSR & RARSR Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Verify signals for all 3 trouble conditions Table 10.4.4
Private Microwave
Inspection *2 Times/Year Secured/No damage or missing parts Table 10.3.1
Testing Monthly Verify signals for all 4 trouble conditions/etc Table 10.4.4
Engine-Driven Generator
Inspection *Weekly No damage or leakage Table 10.3.1
Testing *Weekly Verify operation NFPA 110
Uninterrupted Power Supply (UPS)
Testing *Per manufacturer and NFPA 111 Table 10.4.4
Secondary (Standby) Power Supply
Testing Annually Disconnect primary/verify trouble signal/etc Table 10.4.4
Control Panel Trouble Signals
Testing Annually Audible/Visible, Disconnect Switches, Ground-Faults, Signal Transmission Off-Site Table 10.4.4
Conductors
Metallic Testing Annually Stray Voltage, Short Circuit Faults, Ground Faults, Loop Resistance Table 10.4.4
Nonmetallic Fiber Optics/Fiber Optics Cable Power
Testing Annually Circuit Integrity, Supervision Table 10.4.4
Emergency Voice/Alarm Communications Equipment
Inspection Annually No damage or missing parts Table 10.3.1
Phone Set, Phone Jacks, Amplifier/Tone Generators, Call-In Signal Silence, Off-Hook Indicator (Ring Down), System Performance
Testing Annually Full Function Test Table 10.4.4
Special Hazard Equipment
Abort Switches, Cross-Zone Detection Circuits Matrix-Type Circuit, Release Solenoid, Squibb Release Circuit, Verified/Sequential/Counting Zone Circuit, All other devices or circuits or combinations thereof.
Testing Annually Operate switches/sensors and verify Table 10.4.4
Special Procedures
Inspection 2 Times/Year No damage or missing parts Table 10.3.1
Testing Annually Alarm Verification/Multiplex Systems Table 10.4.4
Low Power Radio (Wireless Systems)
Testing Monthly Per manufacturer Table10.4.4

Inspection: A visual examination to verify an item is in operating condition and free of physical damage.

Testing: A procedure used to determine the status of a system operating as intended by conducting physical checks.

Maintenance: Work performed to keep equipment operable or to make repairs.

*Servicing may be performed by an owner, but must be performed at least annually by a licensed company

Del. Admin. Code tit. 1, 700, Appendices, app F