Conn. Agencies Regs. § 29-232-34

Current through December 4, 2024
Section 29-232-34 - Method of preparation for internal inspection

The owner or user shall prepare a boiler for internal inspection in the following manner:

(a) Water shall be drawn off and the boiler thoroughly washed;
(b) All manhole and handhole plates, washout plugs, and plugs in water column connections shall be removed and the furnace and combustion chambers thoroughly cooled and cleaned;
(c) All grates of internally fired boilers shall be removed;
(d) At each annual inspection, brickwork shall be removed as required by the inspector in order to determine the condition of the boiler, headers, furnace, supports or other parts;
(e) The steam gage shall be removed for testing at the discretion of the inspector;
(f) Any leakage of steam or hot water into the boiler shall be cut off by disconnecting the pipe or valve at the most convenient point.

Conn. Agencies Regs. § 29-232-34

Effective August 25, 1987