Conn. Agencies Regs. § 29-232-79

Current through December 4, 2024
Section 29-232-79 - Flue connection

Each gas fired boiler shall be equipped with a four-inch vent pipe or flue extended to an approved location outside the building or connected to a chimney flue. Where the horizontal run is more than ten feet, the vent shall be increased to six inches. A draft hood of approved design shall be provided on each boiler.

Conn. Agencies Regs. § 29-232-79

Effective August 25, 1987