Current through October 16, 2024
Section 17-31kk-6 - Planning the AIDS/ARC housingThe application for financial assistance shall address two components, (1) the physical development of the facility and (2) the program operation plan. Planning results for each of these components shall be reflected in the narrative submitted with the Program Design and Financing Plan forms supplied by the Department and shall include:
(a) Physical Development Planning. (1) Evidence of applicant ownership of land and/or building; include any deed restrictions and/or special conditions;(2) Confirmation of zoning compliance for projected use, including description of public transportation access;(3) Map showing site boundaries prepared by registered engineer/architect of land to be purchased;(4) Two (2) independent appraisals for land and/or building purchase;(5) One (1) copy of architectural plans and specifications for construction of building, or renovation costs of One Hundred Thousand Dollars ($100,000) or more; one (1) copy of preliminary drawings if costs are less than One Hundred Thousand Dollars ($100,000);(6) Certification that property will meet building, health and fire codes when renovated.(7) Architect's or applicant's estimate of complete project costs.(b) Program Planning for the Operation of the Housing:(1) Description of need for the program;(2) Description of population to be served;(3) Description of method of selection of residents of facility;(4) Living arrangements for residents;(5) Orientation process for residents, including tenant contract;(6) House rules, including any infraction penalties;(7) Rental fees, including any sliding fee scale;(8) Assurance of applicant's intent and liability to comply with all federal, state and local laws and regulations pertaining to the operation of this type of facility;(9) Table of organization which demonstrates administration, oversight and staffing of residential program.Conn. Agencies Regs. § 17-31kk-6