Current through Register Vol. 47, No. 22, November 25, 2024
Section 4 CCR 723-4-4303 - Meter Testing Equipment and Facilities(a) A utility shall provide, or shall arrange for a qualified third party to provide, such equipment and facilities as may be necessary to make the tests and to provide the service required. Such equipment and facilities shall be available at all reasonable times for inspection by Commission staff.(b) A utility having more than 200 meters in service shall maintain, or shall require the qualified third party that provides meter testing equipment and facilities to maintain, suitable gas meter testing equipment in proper adjustment so as to register the condition of meters tested within one-half of one percent. The utility shall have and shall maintain, for the testing equipment, necessary certificate(s) of calibration showing that the equipment has been tested with a standard certified by the National Institute of Standards and Technology or other laboratory of recognized standing.(c) In its tariff, a utility shall include a description of its meter testing equipment and of the methods employed to ascertain and to maintain accuracy of all testing equipment.(d) A utility shall keep records of certification and calibrations for all testing equipment required by this rule for the life of the equipment.38 CR 17, September 10, 2015, effective 9/30/201540 CR 01, January 10, 2017, effective 1/30/201741 CR 11, June 10, 2018, effective 6/30/201842 CR 07, April 10, 2019, effective 4/30/201943 CR 08, April 25, 2020, effective 5/15/202044 CR 04, February 25, 2021, effective 3/17/202144 CR 24, December 25, 2021, effective 1/14/202245 CR 18, September 25, 2022, effective 10/15/202246 CR 06, March 25, 2023, effective 1/25/202346 CR 08, April 25, 2023, effective 5/15/2023