4 Colo. Code Regs. § 723-4-4205

Current through Register Vol. 47, No. 22, November 25, 2024
Section 4 CCR 723-4-4205 - Gas Transportation Service Requirements
(a) In its tariffs, a utility shall establish maximum rates for gas transportation service. In addition, a utility which desires price flexibility shall include its minimum rates in its tariffs. The following apply to transportation tariff rates:
(I) Maximum rates for transportation shall be based on fully allocated cost methods and shall include an allowance for return on allocated rate base equal to the last rate of return authorized by the Commission for the utility.
(II) A utility may, at its discretion, offer natural gas transportation standby capacity service or standby supply service. A utility may require separate charges for:
(A) natural gas transportation standby capacity (if offered);
(B) standby supply (if offered);
(C) administration, services and facilities; and
(D) a utility's avoidable purchased gas commodity costs based on current market-driven gas prices.
(b) In its tariffs, a utility shall establish terms and conditions for gas transportation service, including at least the following:
(I) all criteria for determining gas transportation capacity;
(II) all gas transportation costs;
(III) all nomination requirements;
(IV) all measurement and facility requirements;
(V) as applicable, all gas supply cost provisions;
(VI) all gas balancing provisions;
(VII) all quality of gas requirements;
(VIII) the utility's line extension policy;
(IX) the gas transportation request form required by paragraph 4206(a);
(X) the utility's gas transportation standard gas transportation service agreement, which shall include the statements required by paragraph 4206(d); and
(XI) the utility's standard agency agreement required by paragraph 4206(e).

4 CCR 723-4-4205

38 CR 17, September 10, 2015, effective 9/30/2015
40 CR 01, January 10, 2017, effective 1/30/2017
41 CR 11, June 10, 2018, effective 6/30/2018
42 CR 07, April 10, 2019, effective 4/30/2019
43 CR 08, April 25, 2020, effective 5/15/2020
44 CR 04, February 25, 2021, effective 3/17/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 18, September 25, 2022, effective 10/15/2022
46 CR 06, March 25, 2023, effective 1/25/2023
46 CR 08, April 25, 2023, effective 5/15/2023