4 Colo. Code Regs. § 723-4-4760

Current through Register Vol. 47, No. 22, November 25, 2024
Section 4 CCR 723-4-4760 - Gas DSM Bonus (G-DSM Bonus) Applications

The Commission shall review each G-DSM bonus application submitted and shall determine the level of bonus, if any, for which the utility is eligible. The collection on any G-DSM bonus awarded will be apportioned between residential and nonresidential customers based on the proportion of residential and nonresidential net economic benefits used to calculate the G-DSM bonus.

(a) G-DSM bonus filing requirements. The utility shall file its G-DSM bonus application as part of the annual report submitted to the Commission on the timetable set forth in rule 4752. The utility may request a G-DSM bonus not to exceed the lower of 25 percent of the expenditures or 20 percent of the net economic benefits of the DSM programs, applying the bonus calculation procedure set forth in rule 4754. The G-DSM bonus, as modified and approved by the Commission, shall not count against a gas utility's authorized rate of return or be considered as net operating earnings in rate proceedings.
(b) Contents of G-DSM bonus filing. In the G-DSM bonus filing, the utility shall submit to the Commission the following, at a minimum:
(I) documented expenditures on DSM programs for the current G-DSMCA period;
(II) gas savings for the calendar year for which the bonus is to be awarded estimated following and the techniques approved in the DSM plan. The utility shall explain whether the actual gas savings are validated through the measurement and verification process as approved in the utility's DSM plan;
(III) estimated cost-effectiveness of program expenditures for the current G-DSMCA period in terms of the amount of gas saved per unit of program expenditures;
(IV) actual gas savings and the techniques used to calculate these gas savings for the prior G-DSMCA period. The utility shall explain whether the actual gas savings are validated through the measurement and verification process, pursuant to rule 4755;
(V) actual cost-effectiveness of program expenditures for the prior G-DSMCA period in terms of the amount of gas saved per unit of program expenditures. The utility shall explain whether the actual cost effectiveness of program expenditures is validated through the measurement and verification process, pursuant to rule 4755; and
(VI) proposed tariffs containing rates to collect the bonus over 12 months.
(c) The Commission shall issue a decision approving, modifying, or disapproving a DSM bonus application within 90 days of the utility filing of the application. The Commission shall allow oral testimony and shortened discovery response times as necessary to expedite the schedule.
(d) Accounting for G-DSM bonus. Accounting for G-DSM bonus shall follow what has been prescribed for G-DSMCA costs, specifically in regard to interest on over- and under- recovery. A separate sub-account in Account No. 186 shall be created for any deferred G-DSM bonus amount.
(e) Prudence review and adjustment of G-DSM bonus. If the Commission finds that the actual performance varies from performance values used to calculate the G-DSM bonus in rule 4754, then an adjustment shall be made to the amount of G-DSM bonus award. Any true-up in G-DSM bonus will be implemented on a prospective basis.

4 CCR 723-4-4760

38 CR 17, September 10, 2015, effective 9/30/2015
40 CR 01, January 10, 2017, effective 1/30/2017
41 CR 11, June 10, 2018, effective 6/30/2018
42 CR 07, April 10, 2019, effective 4/30/2019
43 CR 08, April 25, 2020, effective 5/15/2020
44 CR 04, February 25, 2021, effective 3/17/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 18, September 25, 2022, effective 10/15/2022
46 CR 06, March 25, 2023, effective 1/25/2023
46 CR 08, April 25, 2023, effective 5/15/2023