3 Colo. Code Regs. § 722-1.7

Current through Register Vol. 47, No. 22, November 25, 2024
Section 3 CCR 722-1.7 - The Process Regarding Obtaining an Extension of Time for Participation in an Educational Program

The purpose of this Rule is to outline how a student or instructor participating in an educational program can obtain an extension under section 12-235-110(1)(c)(IV), C.R.S.

A resident of another state who does not hold a massage therapy license in Colorado may engage in massage therapy for a limited period of time in this state if:

A. The person is participating as a student or instructor of an educational program that does not exceed sixteen days in duration during any twelve month period; or
B. If the program exceeds sixteen days in duration, the person must obtain a grant of an extension from the Director five working days prior to the seventeenth day in accordance with procedures prescribed by the Director.

3 CCR 722-1.7

37 CR 11, June 10, 2014, effective 7/1/2014
38 CR 01, January 10, 2015, effective 1/30/2015
40 CR 01, January 10, 2017, effective 1/30/2017
40 CR 19, October 10, 2017, effective 10/30/2017
43 CR 03, February 10, 2020, effective 1/1/2020
43 CR 07, April 10, 2020, effective 4/30/2020
43 CR 22, November 25, 2020, effective 12/15/2020
44 CR 09, May 10, 2021, effective 5/30/2021
45 CR 17, September 10, 2022, effective 8/15/2022
45 CR 16, August 25, 2022, effective 9/14/2022
45 CR 21, November 10, 2022, effective 11/30/2022