8 Colo. Code Regs. § 1206-4, pt. 4

Current through Register Vol. 47, No. 22, November 25, 2024
Part 4 - Permit and Inspection Fees
4.1. The annual permit fee shall be forty-five dollars ($45.00) for permits issued to permit holders outside of Groundwater Management Districts that have contracted with the Department for enforcement of 35-11-113 of the Chemigation Act.
4.2. The annual permit fee shall be forty-five dollars ($45.00) for permit holders within Groundwater Management Districts that have contracted with the Department for enforcement of 35-11-113 of the Chemigation Act.
4.3. The inspection fee shall be fifty dollars ($50.00) for each chemigation system inspection conducted by the Department.
4.3.1. Upon completion of an inspection of a chemigation system conducted by the Department, the permit holder shall be provided a billing for inspection of each chemigation system.
4.3.2. Payment of the inspection fee shall be made to the Department within forty-five (45) days of the date of the inspection.
4.4. Failure to submit payment of the inspection fee(s) to the Department or to a Groundwater Management District shall constitute a violation of these Rules and shall be grounds for suspension or revocation of the permit.
4.5. No permit shall be renewed until the permittee has paid all outstanding inspection fees.
4.6. In the event that it is apparent that no willful violation has occurred, there shall be no fee charged for the first reinspection of any system that fails to meet the standards set forth in Part 6.8 of these Rules.
4.6.1. A permittee who fails to correct a malfunctioning system by the time of the first reinspection shall be required to pay the inspection fee for any subsequent inspection.
4.7. Each irrigation system for which a permit has been issued may be inspected at least once every two years.

8 CCR 1206-4, pt. 4

41 CR 23, December 10, 2018, effective 12/30/2018