Section 7 CCR 1101-8-2-5 - Automated People Movers
(1) The Conveyance Contractor who intends to install an APM or perform an APM Alteration shall conform to the requirements in either Section 2-4-1 or 2-4-2 of these regulations.
(2) The Conveyance Owner or Managing Agent where the APM system is located shall arrange for inspection of verification testing of the installed or altered APM system by a Conveyance Inspector and shall submit the following items to the Administrator.
(a) Report documenting System Verification completed at the factory
(b) Report documenting on-site system verification
(c) Certificate of Substantial Completion
(3) A Conveyance Inspector shall witness the testing of the APM system as defined in the currently-adopted edition of ASCE 21 (Annual Internal Audit Responsibilities) on an annual frequency. The results of the testing shall be submitted to the Administrator.
(4) Following the Administrator's determination that the documentation listed in (2) or (3) of this Section indicates that the conveyance conforms to standards listed in Section 2-2 (1)(b) of these regulations, the Administrator will issue the Certificate of Operation for the APM system.

7 CCR 1101-8-2-5

37 CR 21, November 10, 2014, effective 1/1/2015
37 CR 21, November 10,2014, effective 1/1/2015
40 CR 05, March 10, 2017, effective 4/1/2017
42 CR 23, December 10, 2019, effective 1/1/2020
43 CR 23, December 10, 2020, effective 1/1/2021
45 CR 23, December 10, 2022, effective 1/1/2023